| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC NEAR GOVT MIDDLE SCHOOL VILLAGE KHERI SANWAL TEHSIL AND DISTRICT CHARKHI DADRI | CHARKHI DADRI | CHARKHI DADRI | HARYANA | ₹3.4 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹3.8 CrRejected-Finance | ₹3.8 Cr | L2 | Rejected-Finance Highest bidder |
| 3 | Rejected-Technical 491 28 4TH FLOOR TOWNE CENTRE MALL BEHIND D PARK MODEL TOWN NEAR POLICE CHOWKI ROHTAK 124001 | ROHTAK | HARYANA | 124001 | - | - | Rejected-Technical Non responsive |
| Sl No | Description | Qty | Unit | PARMIL KUMAR L2 | PAWAN KUMAR CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | NS ITEM:Credit of old steel bars (scrap) | 4,970.23 | Kg. | 30 -₹1,49,107 | 30 -₹1,49,107 |
| 2.00 | NS ITEM:Credit of old brick bats available after dismantling | 286.8 | Cum | 880 -₹2,52,384 | 880 -₹2,52,384 |
| 3.00 | NS ITEM:Credit of dismantled RCC pipe class NP3 pipe : 1800 MM outer Dia | 87.78 | Metre | 9,454 -₹8,29,872 | 9,454 -₹8,29,872 |
| 4.00 | NS ITEM:Excavating, supplying and filling of earth (including royalty) by mechanical transport upto all lead/lift, including loading, unloading and stacking, multiple rehandling by manual means/mechanical machinery including ramming and watering of the earth in layers not exceeding 20 cm. etc complete in all respect with full satisfaction of Engineer-In-Charge.
Note: 1. The contractor shall mandatorily visit the site before submitting quoted rates. Access to the drain at places is through narrow approaches and streets, necessitating multiple manual rehandling of earthwork. The quoted rates shall be deemed to include all lifts, leads, and associated handling.
2. As there is no local earth available at site being drain alignment in Rural aera having narrow streets, no extra payment will be made to contractor irrespective of any lead/lift /re-handling involved in the execution of work. | 1,04,879.15 | Cum | 232.5 ₹2.4 Cr | 212.5 ₹2.2 Cr |
Updated dates
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
26 Feb 2026, 6:00 pmClosed
ISHAN SINGH SIWACH
W.S. Divn., B/Garh
Estimate for Strengthening of Bank of KCB Drain from RD 0 to 15000
2026_HRY_502087_1
2026D70C2A26 2F26 4FF6 AE6C 6DC783DD37F61616IRR
Open Tender
Civil Works
250 days
GANGARWA LUKSAR Zardakpur BUPANIA
Strengthening of Bank of KCB Drain from RD 0 to 15000
3 documents required · 3 mandatory
₹15,000
₹6.0 L
Yes
Bahadurgarh
2 Apr 2026
12 Feb 2026
27 Feb 2026
12 Feb 2026
26 Feb 2026
12 Feb 2026
16 Feb 2026
NS ITEM:Credit of old steel bars (scrap)
NS ITEM:Credit of old brick bats available after dismantling
NS ITEM:Credit of dismantled RCC pipe class NP3 pipe : 1800 MM outer Dia
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
HSR Item [10.34]Providing and laying dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. [Through Rate]
HSR Item [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
HSR Item [11.57]Providing and laying average 6mm thick POP Coating on walls, Ceiling, beams and lintels etc. complete in all respects as approved by the Engineer-In-Charge. [Through Rate]
HSR Item [11.95.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. New work (Two or more coat applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate]
HSR Item [17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate]
HSR Item [17.75]Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within any lead. [Through Rate]
HSR Item [21.95.13]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 13. 1800 mm [Through Rate]
HSR Item [27.10.1.2]RCC Grade M25 1.2. With Batching Plant, Transit Mixer and Concrete Pump [Through Rate]
HSR Item[27.11.1.2]RCC Grade M30 1.2. With Batching Plant, Transit Mixer and Concrete Pump [Through Rate]
HSR Item [27.2]Pointing with cement mortar (1:3 ) on brick work in substructure as per MoRTandH Specifications 1300 & 2200. [Through Rate]
HSR Item [27.28.1.1]Using Batching Plant, Transit Mixer and Concrete Pump 1.1. For formwork and staging add the following: For solid slab super-structure, 20-30 per cent of labour, material and machinery cost Height up to 5m [Through Rate]
HSR Item [27.30.1.1]Using Batching Plant, Transit Mixer and Concrete Pump. 1.1. For formwork and staging add the following: For solid slab super-structure, 20-30 per cent of labour, material and machinery cost Height up to 5m [Through Rate]
HSR Item [27.44.1]Drainage Spouts complete as per drawing no. SD/205 and MoRTandH MoRTandH specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges) 1. For fabrication [Through Rate]
HSR Item [27.5]Plain/Re-inforced cement concrete in sub-structure complete as per drawing and MoRTandH specifications 1500,1700 and 2200. PCC Grade M15 (with concrete Mixer) Height up to 5m [Through Rate]
HSR Item [27.51.3]Filler joint 3. Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement up to 20 mm, covered with sealant complete as per drawing and MoRT&H specifications. [Through Rate]
HSR Item [27.7.1.2]PCC Grade M25 1.2. With Batching Plant, Transit Mixer and Concrete Pump [Through Rate]
HSR Item [27.8.1.2]PCC Grade M30 1.2. With Batching Plant, Transit Mixer and Concrete Pump [Through Rate]
HSR Item [34.4.1]Cautionary sign board 900x900x900mm triangular as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per clause 801 of MORTandH specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting and a certified copy of test reports including three year outdoor weathering test report for sheeting tested in India condition from an independent test laboratory conforming to clause 6.7 of IRC 67-2012 1. Using retro reflective Sheeting Class C as per IRC 67 2012 [Through Rate]
HSR Item [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
HSR Item [4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
HSR Item [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate]
HSR Item [5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
HSR Item [5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. [Through Rate]
HSR Item [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
HSR Item [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
HSR Item [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
HSR Item [7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
HSR Item [7.21.3]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 3. Cement mortar 1:3 (1 cement : 3 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_580742.xls
BOQ • 0.39 MB
AD0151311.pdf
Additional Documents • 0.88 MB
Download all tender documents and submit your bid