Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.8 L+₹17,917.62 (6.94%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.9 L+₹32,635.91 (12.6%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹3.5 L
EMD Value
₹6,886
Closing Date
11 Sept 2026, 6:00 pmClosed
Divisional Forest Officer Shopian
O/o the Divisional Forest Officer Shopian at Padpawan
Upgradation of Block Officers Hut at Keller, Forest Range Romshi, Forest Division Shopian for the year 2026-27 under the Scheme CAMPA
2026_FD_323471_1
e-Nit 13 of 2026-27
Open Tender
Civil Works
Percentage
60 days
Keller
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
PCCF Jammu and Kashmir
₹6,886
22 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Bos Hut Keller | |||||
| 1.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil | 13.54 | CUM | 479.3 | ₹6,489.72 |
| 1.02 | Providing & laying dry stone solling, sand/dust including ramming, dressing etc complete in foundations and under floors, including Mech. Carriage & Head load charges up to site of work complete. | 0.43 | CUM | 1,000 | ₹433 |
| 1.03 | Providing & laying in position cement concrete (1cement: 4 coarse sand: 8 graded stone agg 40mm nominal size) mix of specificied grade excl cost of centering and shuttering. All work upto plinth level. | 0.51 | CUM | 5,202.9 | ₹2,653.48 |
| 1.04 | Centering and shuttering including strutting, propping etc and removal of form work for.Suspended Floors | 7.9 | SM | 718.2 | ₹5,673.78 |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree landings balconies, shelves, chajjas, lintles, bands, plain window sills, staircases and spiral stair cases upto floor five level exculding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement: 1.5 coarse sand: 3 graded stone agg 20mm nominal size). | 0.9 | CUM | 9,821.85 | ₹8,869.13 |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (Thermo-Mechanically Treated bars of grade Fe-500D or more). | 90.27 | KG | 123.2 | ₹11,121.51 |
| 1.07 | Brick work with F.S.P bricks of class designaion 75 in foundation & plinth in cement mortor (1 cement :6 coarse sand). | 2.93 | CUM | 7,571.55 | ₹22,192.21 |
| 1.08 | Half Brick masonry with FSG bricks of class designaion 75 in foundation & plinth with super structure upto floor V level in cement mortor 1 cement:4 coarse sand. | 2.56 | SM | 947.25 | ₹2,421.17 |
| 1.09 | Providing & Laying of RCC Rings for Sokage Pit | 9 | NO | 500 | ₹4,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1088780.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .