| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹53.9 L
EMD Value
₹54,000
Closing Date
13 Feb 2020, 3:00 pmClosed
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Rejuvenation of 5 Nos. of Ponds in Chithamur Block of former Kancheepuram District and present Chengalpattu District under SFC - PU and DP Grant 2019-20 having Pkg No.27/2019-20
2020_RDTN_157154_1
DIPR/646/Tenders/2020, dt.30.01.2020
Open Tender
Civil Works
Item Rate
180 days
Chithamur Block
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹54,000
O/o The Project Director DRDA Kancheepuram
21 Feb 2020
6 Feb 2020
13 Feb 2020
6 Feb 2020
13 Feb 2020
6 Feb 2020
10 Feb 2020
Amount
PART I: Rejuvenation of North Kavakadu Kulam in Indalur Panchayat Estimate Amount : Rs.10.50 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc., compete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Plastering In Cement mortar 1:5 mix - 12mm thick including cost and conveyance etc., complete.,
PART II: Rejuvenation of South kavakadu kulam in Indalur Panchayat Estimate Amount : Rs.10.60 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc., compete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Plastering In Cement mortar 1:5 mix - 12mm thick including cost and conveyance etc., complete.,
PART III : Rejuvenation of Sitheri Kulam in Thenpakkam Panchayat Estimate Amount : Rs.10.78 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc., compete
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Plastering In Cement mortar 1:5 mix - 12mm thick including cost and conveyance etc., complete.,
PART IV : Rejuvenation of Nalpa kulam in Sothupakkam Panchayat Estimate Amount : Rs.11.45 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc., compete
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Plastering In Cement mortar 1:5 mix - 12mm thick including cost and conveyance etc., complete.,
PART V : Rejuvenation of Sitheri Kulam in Sothupakkam Panchayat Estimate Amount : Rs.10.55 Lakh
Clearing the Scrub jungle with uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earthwork in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100 M by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment deploy
Earthwork excavation in all clauses of soil except hard rock which required blasting such as hard red earth, shalls, murrams including all cost and all labour charges etc., complete as per SS 20 B for foundation
Sectioning during forming bund when earth moving machineries, lorries and roller are used for consolidation
Supplying and filling with the river sand in 15 cm thick layer including watering compacting cost and conveyance materials etc.complete complying with the standard specification and as directed by the Engineer in charge of the works For sluices ,weirs qa
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Rough Stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work(using old stones)
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc., compete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Plastering In Cement mortar 1:5 mix - 12mm thick including cost and conveyance etc., complete.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.A.SENGUTUVAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .