| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 CrAccepted-AOC | ₹13.2 Cr | L1 | Accepted-AOC Due to Low price |
| 2 | L2₹14.5 Cr+₹1.4 Cr (10.4%)Rejected-Finance | ₹14.5 Cr+₹1.4 Cr (10.4%) | L2 | Rejected-Finance Due to High price |
| 3 | L3₹15.2 Cr+₹2.0 Cr (15.1%)Rejected-Finance | ₹15.2 Cr+₹2.0 Cr (15.1%) | L3 | Rejected-Finance Due to High price |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
Tender Value
₹14.7 Cr
EMD Value
₹7.5 L
Closing Date
5 Jan 2026, 3:00 pmClosed
O/o the SE(NH)Salem
O/o the Superintending Engineer, National Highways, Omalur main road Narasothipatty, Alagapuram (Po),Salem 636 004
Widening from Single lane to Intermediate Lane and Strengthening at Km 1/6 - 6/6, Km 6/8 - 9/2ndKm 9/4 - 16/610 of Suriyagoundampalayam - Elachipalayam road (via) Ramapuram (M-1238) including Construction of Box Culvert at Km 12/4,Construction of We
2025_MoRTH_888380_1
TNNo20HDONH/25-26/Dt.3.12.25(2
Open Tender
Civil Works
Percentage
365 days
Suriyagoundampalayam Namakkal
Yes, as per Tender Documents
5 documents required · 5 mandatory
₹17,700
15000 online payment through bharatkosh webportal
₹7.5 L
O/o the SE(NH)Salem
21 Apr 2026
3 Dec 2025
6 Jan 2026
3 Dec 2025
5 Jan 2026
3 Dec 2025
15 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing the Light Jungle (W-0002) removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete | 23,100 | One Square Metre | 6.89 | ₹1,59,159 |
| 2 | Picking the existing BT surface upto 50mm thick as directed by the Departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete as per MoRTH-V Revision etc., complete | 2,250 | One Square Metre | 23.36 | ₹52,560 |
| 3 | Earthwork excavation in all classes of soils except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges,materials,tools,equipments and all incidental charges,removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification.For Boxing including conveyance of cut earth away from the site with average lead | 11,747.77 | One Cubic Metre | 143.68 | ₹16,87,919.59 |
| 4 | Providing,laying,spreading and compacting graded stone aggregates for Granular Sub Base,including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site,laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material,labour charges,rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5(Gr-V) | 4,945.17 | One Cubic Metre | 2,114.73 | ₹1,04,57,699.35 |
| 5 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 (For Damaged Portion) | 8,130.73 | One Cubic Metre | 2,585.34 | ₹2,10,20,701.5 |
| 6 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 | 34,364.44 | One Square Metre | 86.33 | ₹29,66,682.11 |
| 7 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 34,364.44 | One Square Metre | 19.9 | ₹6,83,852.36 |
| 8 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 51,244.28 | One Square Metre | 28.77 | ₹14,74,297.94 |
| 9 | Providing, laying 55/60mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm. 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 65mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc.. including labour for attending to paver to site etc., including lure and fuel charges for 20-30t CMP with bitumen boiler. tipper trucks. Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc. complete as per specification using CMP as per clause 505 of MORTH rev-5- Gr-II | 1,499.05 | One Cubic Metre | 10,798.92 | ₹1,61,88,121.03 |
| 10 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver finisher hydrostatic (more than 5m width) to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 (Grade-II) | 429.31 | One Cubic Metre | 9,241.82 | ₹39,67,605.74 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_933748.xls
BOQ • 0.39 MB
DOc.rar
Tender Documents • 3.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .