Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.8 CrAccepted-AOC | ₹32.8 Cr | L1 | Accepted-AOC L1 Letter No. 3028(S)WE Date-15.07.2026 |
| 2 | L2₹35.6 Cr+₹2.7 Cr (8.34%)Rejected-Finance COLLEGE ROAD JASHPUR NAGAR CHHATTISGARH 496331 | JASHPUR NAGAR | JASHPUR | CHHATTISGARH | 496331 | ₹35.6 Cr+₹2.7 Cr (8.34%) | L2 | Rejected-Finance L3 Letter No. 3028(S)WE Date-15.07.2026 |
| 3 | L3₹39.5 Cr+₹6.6 Cr (20.2%)Rejected-Finance 504 MANGAL MURTI HEIGHTS RANI BAGAN HARMU ROAD RANCHI | RANCHI | JHARKHAND | 829205 | ₹39.5 Cr+₹6.6 Cr (20.2%) | L3 | Rejected-Finance L3 Letter No. 3028(S)WE Date-15.07.2026 |
| 4 | Rejected-Technical AMLA TOLA CHAIBASA | CHAIBASA | WEST SINGHBHUM | JHARKHAND | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/s Ray Construction L1 | M/s Vinod Kumar Jain L2 | ANAND CONSTRUCTION INFRASTRUCTURE PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per technical specification clause 201.1 SOR 2.03 | 2.56 | Hect. | 2,26,558.72 ₹2,26,558.72 | 1,28,000 ₹1,28,000 | 1,02,144 ₹1,02,144 Lowest |
| 2.00 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. SOR 3.17 | 762.65 | Cum | 46,887.72 ₹46,887.72 | 3,81,325 ₹3,81,325 | 38,132.5 ₹38,132.5 Lowest |
| 3.00 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per technical specification clause 301.5 SOR 3.16 | 18,935.75 | Cum | 24,59,753.93 ₹24,59,753.93 Lowest | 94,67,875 ₹94,67,875 | 61,54,118.75 ₹61,54,118.75 |
| 4.00 | Construction of Earthen Shoulders and subgrade
Construction of Earthen Shoulders with shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per technical specification clause 301.5 SOR 3.18 | 1,000 | Cum | 1,31,300 ₹1,31,300 Lowest | 1,50,000 ₹1,50,000 | 2,50,000 ₹2,50,000 |
| 5.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. SOR 4.01 B (v) | 1,361.25 | Cum | 40,66,938.56 ₹40,66,938.56 Lowest | 40,83,750 ₹40,83,750 | 49,00,500 ₹49,00,500 |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. SOR 4.14 B | 4,950 | Cum | 1,61,05,666.5 ₹1,61,05,666.5 Lowest | 1,73,25,000 ₹1,73,25,000 | 1,98,00,000 ₹1,98,00,000 |
| 7.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. SOR 5.01 | 7,425 | Sqm | 6,11,374.5 ₹6,11,374.5 | 2,97,000 ₹2,97,000 Lowest | 7,79,625 ₹7,79,625 |
| 8.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. SOR 5.02 (II) | 9,075 | Sqm | 1,48,194.75 ₹1,48,194.75 | 1,36,125 ₹1,36,125 Lowest | 1,63,350 ₹1,63,350 |
| 9.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects. SOR 5.04 B | 482.63 | Cum | 54,29,244.83 ₹54,29,244.83 | 47,29,774 ₹47,29,774 Lowest | 62,74,190 ₹62,74,190 |
| 10.00 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. SOR 5.02 (I) | 7,425 | Sqm | 98,010 ₹98,010 Lowest | 1,11,375 ₹1,11,375 | 1,11,375 ₹1,11,375 |
Tender Value
₹36.2 Cr
EMD Value
₹36.2 L
Closing Date
18 May 2026, 12:00 pmClosed
Executiv Engineer
Executive Engineer, RCD, Road Division, Manoharpur.
Construction of H.L RCC Bridge Over Koyal River at 11th Km of Undhan-Baranga-Dhanapali Road Under Road Division, Manoharpur.
2026_CECOM_113291_1
RCD/Manoharpur/01/2026-2027
Open Tender
Civil Works - Bridges
Item Rate
912 days
Manoharpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹36.2 L
CE (Comm) RCD Dhurwa Ranchi
22 Jul 2026
28 Apr 2026
19 May 2026
28 Apr 2026
18 May 2026
28 Apr 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. as per technical specification clause 201.1 SOR 2.03 | - | Hect. | 88,499.5 | - |
| 2 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. SOR 3.17 | 762.65 | Cum | 34 | ₹25,930.1 |
| 3 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per technical specification clause 301.5 SOR 3.16 | 18,935.75 | Cum | 129.9 | ₹24,59,753.93 |
| 4 | Construction of Earthen Shoulders and subgrade
Construction of Earthen Shoulders with shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per technical specification clause 301.5 SOR 3.18 | 1,000 | Cum | 131.3 | ₹1,31,300 |
| 5 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. SOR 4.01 B (v) | 1,361.25 | Cum | 2,659.28 | ₹36,19,944.9 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. SOR 4.14 B | 4,950 | Cum | 3,564.24 | ₹1,76,42,988 |
| 7 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. SOR 5.01 | 7,425 | Sqm | 81.52 | ₹6,05,286 |
| 8 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. SOR 5.02 (II) | 9,075 | Sqm | 16.03 | ₹1,45,472.25 |
| 9 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects. SOR 5.04 B | 482.63 | Cum | 11,557.47 | ₹55,77,981.75 |
| 10 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. SOR 5.02 (I) | 7,425 | Sqm | 12.95 | ₹96,153.75 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
SBD.pdf
Tender Documents • 1.52 MB
BOQ_152997.xls
BOQ • 0.37 MB
FOB.pdf
Additional Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .