Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance DVC PARA PANDAVESWAR PASCHIM BARDHAMAN WEST BENGAL 713346 | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.3 L
EMD Value
₹6,600
Closing Date
27 Mar 2026, 5:00 pmClosed
Area Engineer Civil
Office of the General Manager Pandaveswar Area
MAKING BARBED FENCING WIRE AT A AND B PIT OF PANDAVESWAR COLLIERY
2026_ECL_356596_1
GM-PA/AE(C)/e Tender/25-26/42/424 dated 13.03.2026
Open Tender
Civil Works - Others
Percentage
21 days
Pandaveswar Colliery
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,600
24 Mar 2026
13 Mar 2026
28 Mar 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
13 Mar 2026 - 17 Mar 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately).
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work
Total impact of GST for the purpose of CTC
stage.html
html • 0.02 MB
finance_369453.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.56 MB
BOQ_369453.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .