Superintending Engineer/Generation/Tirunelveli
Superintending Engineer / Tirunelveli Generation Circle/ Anna building, Sivanthipatti Road, Maharajanagar, Tirunelveli District - 627011
Construction of RCC retaining wall to the protect the proposed extension of the existing Switch Yard near Kodayar Power House I (Reach II) in view of the ongoing Renovation, Modernisation and uprating of the Kodayar Power House I from 1x60MW to 1x70
2022_EB_260686_1
SE/GC/TIN/C04/2021-22
Open Tender
Civil Works - Others
Piece-work
90 days
Kodayar Lower Camp
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹29,900
Yes
1 Dec 2022
3 Nov 2022
19 Nov 2022
4 Nov 2022
18 Nov 2022
5 Nov 2022
Amount
Earth work excavation for foundation and depositing on bank in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of labour, T&P, lead, lift etc., complete.
Earth work excavation in medium rock and dence medium rock not requiring blasting with a initial lead of 10m & initial lift of 2m including cost of labour, T&P, lead, lift etc., complete.
Earth work excavation in hard rock by wedging, chiselling and trimming to proper shape where blasting is prohibited with initial lead of 10m and lift of 2m including cost of labour, T&P, lead, lift etc., complete.
Providing grip rod in hard rock using 25mm dia. RTS rod in 32mm dia drilled hole with cement slurry including cost of all materials, grouting of holes by cement slurry, labour, lead, lift, etc., complete. (Excluding the cost of RTS rod)
PCC 1:3:6 for foundation using 40mm HBG metal including cost of all materials, labour, lead, lift, head load, curing, etc., complete.
Providing Centering for sides using MS sheet including cost for strutting, supported by casurina props, cost of all materials, lead, lift, T&P etc complete.
Providing steel reinforcements to all R.C.C works as per the direction of Engineer, including cost of all materials, labour for cutting, bending, placing and typing in position, lead, lift, T&P, etc., complete.
RCC 1:1.5:3 using 12mm to 20mm HBG metal for retaining wall including mixing charges with mixer machine, vibrating charges, cost of all labour, materials, T&P, lead, lift, curing etc., complete but excluding cost of reinforcement and centering charges etc.
R.R masonry of CM 1:5 for foundation including cost of all materials, labour, scaffolding, T&P, lead, lift, head load etc complete.
Pointing with cement mortar 1:3 for revetment including all cost of materials, labour, scaffolding, lead, lift, etc complete.
Flooring with cement mortar 1:5 of 20mm thick including cost of all materials, labour, scaffolding, lead, lift, head load, etc., complete.
Providing weep holes using 50mm dia pipe for revetment including all cost of materials labour for cutting, scaffolding, lead, lift, etc complete.
Filling with Gravel in back side portion at site including cost of all materials, tool & plants, labour, lead, lift, etc., complete.
GST 18% as per Govt. Norms
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .