| 1 | L1₹3.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.8 L+₹42,000 (12.3%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UNIVERSAL ELECTRICALS L1 | VIDHATA ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00Industrial Area Sheoganj and Sheoganj Extn. | |||||
| 2.00 | Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including completerepair and maintenance of pump set with cost of material and labour requited for repairing rewinding lowering and unloweringetc The scope of work also includes repair and maintenance of panel board main switches kit Kates Electricconnections service cable and submersible cables inclusive of cost of material and labour required for uninterruptedfunctioning of tube well slt is also inclusive of complete repair and maintenance of pipes connected with pump andmotor its replacement if required regular upkeeping of log book etc and other works as mentioned in tender documentscope of work complete in all respect and as directed by engineer in charge | 12 | Per tubewell Per Month | 1,600 ₹19,200 Lowest | 2,000 ₹24,000 |
| 3.00 | Regular operation and maintenance of pump houses located at WSS Complex The work includes operation ofdistribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporationRegular Operation of pump house installed with existing centrifugal Monoblock pump motors with round the clockmonitoring including complete repair and maintenance of pump sets connecting suction delivery pipes jointing materialpanel main switches kit Kates Electric connections service cable including cost of material and labour required forrepairing rewinding removal and replacement etc for uninterrupted functioning of Electric Panels and Pump sets withregular upkeepment of log books repair of leakages in pump glans and MS Cl AC Pipeline system inside of WSS Campuscomplete Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus completein all respect as directed by Engineer in charge | 24 | Per Pump House Per Month | 5,400 ₹1,29,600 Lowest | 6,000 ₹1,44,000 |
| 4.00 | Repair and maintenance of existing distribution rising main pipe line system consisting of AC Pressure Pipeline PVCUPVC HDPE CI DJ Lines for maintaining smooth water supply in area covered under the scope of work The scope of workincludes timely repairing of leakage in all existing distribution rising main pipeline of all sizes by digging out suitable sizeof pit in soft and loose soil hard soil including cutting of Bituminous Cement Concrete WBM WMM surface at any site ofwork at no extra cost It is also inclusive of cutting of pipe ends fixing of pipe pieces with jointing material to make repairleak proof and refilling the pit trench by excavated soil by ramming it at all sides of pipes upto ground level Contractorwill do dewatering at his own level by making necessary arrangements if required Contractor will use their own T and Phowever the pipe line and jointing materials sluice valves etc shall be provided by the Corporation but the contractorshall have to deposit the damaged material in RIICO store But no additional payment shall be made on account oftransportation | 24 | Per Month | 8,050 ₹1,93,200 Lowest | 9,000 ₹2,16,000 |
Tender Value
₹5.3 L
EMD Value
₹10,681
Closing Date
9 Sept 2025, 5:00 pmClosed
UNIT HEAD
RIICO ABUROAD
Operation and Maintenance of Water Supply Scheme at industrial Area Sarneshwar, Sheoganj and Sheoganj Extn., Distt. Sirohi, Unit-Abu Road
2025_RIICO_498222_1
2025-26/Abu Road/13
Open Tender
Civil Works - Water Works
Percentage
RIICO SIROHI
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
RIICO
₹10,681
19 Sept 2025
1 Sept 2025
10 Sept 2025
1 Sept 2025
9 Sept 2025
1 Sept 2025
Amount
Industrial Area Sheoganj and Sheoganj Extn.
Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including completerepair and maintenance of pump set with cost of material and labour requited for repairing rewinding lowering and unloweringetc The scope of work also includes repair and maintenance of panel board main switches kit Kates Electricconnections service cable and submersible cables inclusive of cost of material and labour required for uninterruptedfunctioning of tube well slt is also inclusive of complete repair and maintenance of pipes connected with pump andmotor its replacement if required regular upkeeping of log book etc and other works as mentioned in tender documentscope of work complete in all respect and as directed by engineer in charge
Regular operation and maintenance of pump houses located at WSS Complex The work includes operation ofdistribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporationRegular Operation of pump house installed with existing centrifugal Monoblock pump motors with round the clockmonitoring including complete repair and maintenance of pump sets connecting suction delivery pipes jointing materialpanel main switches kit Kates Electric connections service cable including cost of material and labour required forrepairing rewinding removal and replacement etc for uninterrupted functioning of Electric Panels and Pump sets withregular upkeepment of log books repair of leakages in pump glans and MS Cl AC Pipeline system inside of WSS Campuscomplete Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus completein all respect as directed by Engineer in charge
Repair and maintenance of existing distribution rising main pipe line system consisting of AC Pressure Pipeline PVCUPVC HDPE CI DJ Lines for maintaining smooth water supply in area covered under the scope of work The scope of workincludes timely repairing of leakage in all existing distribution rising main pipeline of all sizes by digging out suitable sizeof pit in soft and loose soil hard soil including cutting of Bituminous Cement Concrete WBM WMM surface at any site ofwork at no extra cost It is also inclusive of cutting of pipe ends fixing of pipe pieces with jointing material to make repairleak proof and refilling the pit trench by excavated soil by ramming it at all sides of pipes upto ground level Contractorwill do dewatering at his own level by making necessary arrangements if required Contractor will use their own T and Phowever the pipe line and jointing materials sluice valves etc shall be provided by the Corporation but the contractorshall have to deposit the damaged material in RIICO store But no additional payment shall be made on account oftransportation
Description of Work / Item(s)
Amount
Industrial Area Sarneshwar
Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including completerepair and maintenance of pump set with cost of material and labour requited for repairing rewinding lowering and unloweringetc The scope of work also includes repair and maintenance of panel board main switches kit Kates Electricconnections service cable and submersible cables inclusive of cost of material and labour required for uninterruptedfunctioning of tube well slt is also inclusive of complete repair and maintenance of pipes connected with pump andmotor its replacement if required regular upkeeping of log book etc and other works as mentioned in tender documentscope of work complete in all respect and as directed by engineer in charge
Regular operation and maintenance of pump houses located at WSS Complex The work includes operation ofdistribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporationRegular Operation of pump house installed with existing centrifugal Monoblock pump motors with round the clockmonitoring including complete repair and maintenance of pump sets connecting suction delivery pipes jointing materialpanel main switches kit Kates Electric connections service cable including cost of material and labour required forrepairing rewinding removal and replacement etc for uninterrupted functioning of Electric Panels and Pump sets withregular upkeepment of log books repair of leakages in pump glans and MS Cl AC Pipeline system inside of WSS Campuscomplete Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus completein all respect as directed by Engineer in charge
Repair and maintenance of existing distribution rising main pipe line system consisting of AC Pressure Pipeline PVCUPVC HDPE CI DJ Lines for maintaining smooth water supply in area covered under the scope of work The scope of workincludes timely repairing of leakage in all existing distribution rising main pipeline of all sizes by digging out suitable sizeof pit in soft and loose soil hard soil including cutting of Bituminous Cement Concrete WBM WMM surface at any site ofwork at no extra cost It is also inclusive of cutting of pipe ends fixing of pipe pieces with jointing material to make repairleak proof and refilling the pit trench by excavated soil by ramming it at all sides of pipes upto ground level Contractorwill do dewatering at his own level by making necessary arrangements if required Contractor will use their own T and Phowever the pipe line and jointing materials sluice valves etc shall be provided by the Corporation but the contractorshall have to deposit the damaged material in RIICO store But no additional payment shall be made on account oftransportation
VIDHATA ASSOCIATES (BID ID -3302543)
VIDHATA ASSOCIATES (BID ID -3302543)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .