Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-Finance AT MALPADA PO PS DIST BALANGIR 767001 | BALANGIR | BALANGIR | ODISHA | 767001 | ₹15.1 L | L1 | Accepted-Finance Stand L1 |
| 2 | L2₹15.2 LRejected-Finance MALPADA BALANGIR BALANGIR ODISHA PIN 767001 | BALANGIR | ODISHA | 767001 | ₹15.2 L | L2 | Rejected-Finance Stand L2 |
| 3 | L3₹18.3 LRejected-Finance AT PO KANTABANJI TUREKLA PIN 767039 DISTRICT BALANGIR ODISHA | KANTABANJI | BALANGIR | ODISHA | 767039 | ₹18.3 L | L3 | Rejected-Finance Stand L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to insufficient technical bid documents |
Tender Value
₹19.0 L
EMD Value
₹19,000
Closing Date
20 Apr 2026, 5:00 pmClosed
Superintending Engineer Kantabanji (RandB) Divn.
O/o the Superintending Engineer Kantabanji (RandB) Division
Provision of 250 KVA, 11/0.4 KV Substation for the External Electrification work for Upgradation of CHC Sindhekela Building in the District of Balangir
2026_EICCL_127875_15
17/KBJ/2025-26(1)
National Competitive Bid
Electrical Works
60 days
KANTABANJI
Please refer tender documents
3 documents required · 3 mandatory
₹6,000
₹19,000
Yes
2 Jul 2026
9 Apr 2026
21 Apr 2026
9 Apr 2026
20 Apr 2026
9 Apr 2026
9 Apr 2026 - 15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A-11kv PP 55 MM SQ AAAC tapping on RSJ/PSC Pole 9 MTR
POLE PSC 9 MTR 300 Kg. including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 20% | - | Each | - | - |
| 2 | Cost of other materials for line and sub station 75X40X6mm. Channel for Straight Cross-ar including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Kg. | - | - |
| 3 | 55 sqmm AAAC including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Mtr. | - | - |
| 4 | 11 KV V-Cross Arm(MS) (10.2 Kg. Eachch) including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 5 | Back Clamp for V' Cross Arm(1.7Kg.) including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 6 | 11 kv F clamp 2.9Kg. Eachch including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 7 | 11 Kv B&S Disc Insulator Polymer 70 KN including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 8 | 11 KV B&S Hardware Fitting including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 9 | 11 KV pin Insulator polymer including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 10 | H.T. Stay Set Complete including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | SET | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_587283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 0.52 MB
DTCB250KVA.pdf
Tender Documents • 1.38 MB
BOQ_587283.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid