Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC AT MALPADA PO PS DIST BALANGIR 767001 | BALANGIR | BALANGIR | ODISHA | 767001 | L1 | Accepted-AOC Agreement drawn and Work Order issued on 30.06.2026 | |
| 2 | L2₹15.2 L+₹2,275.21 (0.15%)Rejected-Finance MALPADA BALANGIR BALANGIR ODISHA PIN 767001 | BALANGIR | ODISHA | 767001 | L2 | Rejected-Finance Stand L2 | |
| 3 | L3₹18.3 L+₹3.2 L (21.1%)Rejected-Finance AT DIHABALARAMPUR PO KARILOPATNA PS PATKURA DIST KENDRAPARA PIN 754223 | KENDRAPARA | KENDRAPARA | ODISHA | 754223 | L3 | Rejected-Finance Stand L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Due to insufficient technical bid documents |
Tender Value
₹19.0 L
EMD Value
₹19,000
Closing Date
20 Apr 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Kantabanji (RandB) Divn.
O/o the Superintending Engineer Kantabanji (RandB) Division
Provision of 250 KVA, 11/0.4 KV Substation for the External Electrification work for Upgradation of CHC Sindhekela Building in the District of Balangir
2026_EICCL_127875_15
17/KBJ/2025-26(1)
National Competitive Bid
Electrical Works
Percentage
60 days
KANTABANJI
Please refer tender documents
3 documents required · 3 mandatory
₹6,000
₹19,000
Yes
17 Jul 2026
9 Apr 2026
21 Apr 2026
9 Apr 2026
20 Apr 2026
9 Apr 2026
9 Apr 2026 - 15 Apr 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A-11kv PP 55 MM SQ AAAC tapping on RSJ/PSC Pole 9 MTR
POLE PSC 9 MTR 300 Kg. including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 20% | - | Each | - | - |
| 2 | Cost of other materials for line and sub station 75X40X6mm. Channel for Straight Cross-ar including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Kg. | - | - |
| 3 | 55 sqmm AAAC including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Mtr. | - | - |
| 4 | 11 KV V-Cross Arm(MS) (10.2 Kg. Eachch) including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 5 | Back Clamp for V' Cross Arm(1.7Kg.) including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 6 | 11 kv F clamp 2.9Kg. Eachch including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 7 | 11 Kv B&S Disc Insulator Polymer 70 KN including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 8 | 11 KV B&S Hardware Fitting including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 9 | 11 KV pin Insulator polymer including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | Each | - | - |
| 10 | H.T. Stay Set Complete including 1% LC, T&P @ 2%, Transportation @ 7.5%, Erection Charge @ 10% | - | SET | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 0.52 MB
DTCB250KVA.pdf
Tender Documents • 1.38 MB
BOQ_587283.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .