Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L - 1₹1.5 LAccepted-AOC KHETTRY ROAD 27 RAM SWARUP KOLKATA WEST BENGAL 700053 | KOLKATA | WEST BENGAL | 700053 | L - 1 | Accepted-AOC L - 1 Bidder | |
| 2 | Rejected-Technical PATEL NAGAR P O PHSURO BAZAR BERMO BOKARO 829144 JHARKHAND INDIA | BOKARO | BOKARO | JHARKHAND | 829144 | - | Rejected-Technical L- 4 Bidder | |
| 3 | Rejected-Technical AT BERMO PO PHUSRO DIST BOKARO JHARKHAND | BERMO | BOKARO | JHARKHAND | - | Rejected-Technical L- 2 Bidder | |
| 4 | Rejected-Technical AT RANI BAGH PHUSRO P O DHORI DIST BOKARO | - | Rejected-Technical L- 3 Bidder |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
7 Jun 2024, 9:00 amClosed
Project Engineer (Excv)
Office of The Project Officer, Kathara Colliery.
Repairing of left hand side and right hand side rear suspension and its oval chassis eye hole of BH-100 T Dumper Sl. No. D-90025 (CIL No. 11864) of Kathara OCP.
2024_CCL_309303_1
PO/PE(Ex)/KTC/E-Tend./24-25/38 dt.29.05.24
Open Tender
Excavation Department Work
Item Rate
8 days
Kathara Colliery
Refer Tender Document
5 documents required · 5 mandatory
₹2,700
9 Aug 2024
29 May 2024
8 Jun 2024
30 May 2024
7 Jun 2024
30 May 2024
30 May 2024 - 31 May 2024
Amount
Opening of rear side suspension pin with the help of hydraulic jack and fixture arrangement.
Hydraulic jack cost (100 ton)
Fixture cost
Welder
Helper
Fitter
Supervisor
One side suspension eye broken portion alignment setting by hydraulic jack foundation machine.
Cracked portion V-groove making after welding with supporting plate.
Its inner eye on material depositing after grinding according to proper bushing O.D size.
02 Nos. lock groove new making.
Spherical bearing fitting in both end eye but bearing supply by departmentally.
Both rub pin on material depositing after machining.
Its Chassis 04 Nos. lower and upper oval eye hole on material depositing with the help of suitable electrode.
Its Chassis 02 Sets lower and upper welded eye line boring according to proper pin O.D. size.
Rear suspension fitting fixing on machine after pin locking.
Welder
Helper
Fitter
Supervisor
Total impact of GST for the purpose of CTC
M/S HINDUSTAN ENGINEERING WORKS
M/S RAJU ENGINEERING WORKS
M/S HIND ENTERPRISES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_320493.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .