Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.1 L+₹3,011.50 (0.74%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Chinnasami L2 | KIRUBA CONTRACTORS L1 |
|---|---|---|---|---|---|
| 1.001.) Construction of Cremation Shed at Burial ground at Naduvalur H/O Naduvalur Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 23.21 | cum | 246.52 ₹5,721.73 Lowest | 246.52 ₹5,721.73 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 10.01 | cum | 5,013.94 ₹50,189.54 Lowest | 5,013.94 ₹50,189.54 Lowest |
| 4.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 2.24 | cum | 6,387.16 ₹14,307.24 Lowest | 6,387.16 ₹14,307.24 Lowest |
| 5.00 | Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed. | 53.21 | Sqm | 152.63 ₹8,121.44 | 142 ₹7,555.82 Lowest |
| 6.00 | Brickwork in Cement mortar 1 : 5 mix using country bricks including cost and conveyance of all materials to site and labour charges etc complete. | 8.97 | cum | 5,935.62 ₹53,242.51 Lowest | 5,935.62 ₹53,242.51 Lowest |
| 7.00 | Refilling the basement with excavated earth other than sand complying the Standard specification | 1.15 | cum | 42.85 ₹49.28 Lowest | 42.85 ₹49.28 Lowest |
| 8.00 | Collection and Supply of Sand and filling in to basement including cost and conveyance to the site and all labour charges for filling as per standard specifications | 2.29 | cum | 1,840.89 ₹4,215.64 Lowest | 1,840.89 ₹4,215.64 Lowest |
| 9.00 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) for column | 10.06 | Sqm | 516.5 ₹5,195.99 Lowest | 516.5 ₹5,195.99 Lowest |
| 10.00 | Centering for roof slab | 48.32 | Sqm | 1,033 ₹49,914.56 Lowest | 1,033 ₹49,914.56 Lowest |
Tender Value
₹4.2 L
EMD Value
₹4,200
Closing Date
16 Apr 2025, 3:00 pmClosed
Block Development officer
Union office , Gangavalli
Construction of Cremation Shed at Burial ground at Naduvalur H/O Naduvalur Panchayat
2025_RDTN_540526_1
Roc.2687/2024/T-2
Open Tender
Civil Works
Item Wise
Items
Construction of Cremation Shed at Burial ground at Naduvalur H/O Naduvalur Panchayat
3 documents required · 3 mandatory
₹0
₹4,200
5 Nov 2025
8 Apr 2025
16 Apr 2025
8 Apr 2025
16 Apr 2025
8 Apr 2025
8 Apr 2025 - 16 Apr 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .