Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹21.7 LAccepted-AOC HOUSE NO 22603 STREET NO 16 BAGHU ROAD BATHINDA | 1st | Accepted-AOC OK |
Tender Value
Refer Docs
EMD Value
₹35,605
Closing Date
15 Feb 2021, 5:00 pmClosed
Er. Amit Kumar
Executive Engineer, Water Supply and Sanitation Division No.3, Bathinda, Bhagu Road Bathinda
P and Laying Fixing and Jointing of PVC Pipes 6Kgf Sluice valve chambers dismantling of flexible pavents etc and all other works contingent thereto
2021_WSS_59141_1
Re-Tender Notice No. 330-41 Dt. 15/01/2021
Open Tender
Civil Works - Others
Item Wise
60 days
O/o Executive Enginere, WSS DIV 3 Bathinda
As per Approved DNIT
4 documents required · 4 mandatory
₹1,000
₹35,605
23 Apr 2021
16 Jan 2021
16 Feb 2021
16 Jan 2021
15 Feb 2021
16 Jan 2021
Item Wise Description :
Dismantling of Flexible Pavements(Bituminous Courses) (By Mechanical Means) a) Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of MORT&H specifications
Water Bound Macadam Grading I i) Providing, laying, spreading and compacting stone aggregates of Grading I to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes refilling consolidation, watering including the cost of dewatering of rain water diversion for traffic, night signals providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respects. a) Earth work upto 1.5 m. Depth for (i) All classes of soil except rocky
Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. xv) 110mm o/d pipe of 6 Kgf. / sqcm
xvi) 160mm o/d pipe of 6 Kgf. / sqcm
Providing & fixing C.I./DI flanged end.,stem of ss(AIS 1410)and Bronze(Gun Metal ) working part sluice valve ISI marked 14846 -2000 .including jointing testing and cost of Nut Bolt and insertion sheet ,all carriage complete(with the approval of engineer- in-charge) b) 100mm i/d Sluice Valves flanged.
c) 150mm i/d Sluice Valves flanged
Construction of masonary Sluice Valve Chamber excluding sluice valve cover as per standard design & drawing of public health department. b) Size 0.9 m. x 0.9 m.
Hand boring Horizontly for crossing of pipe under road or any other obstacle by using Auger/Bocki method.Including excavation , stringing and jointing of pipe upto 160mm complete
Prov.for connecting the proposed pipe with existing pipe line of any size including the cost of excavation bailing out water complete in all respects. i) 110mm o/d
ii) 160mm o/d
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .