Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.3 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹8.6 L+₹33,524 (4.04%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹9.0 L+₹66,095 (7.96%)Rejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | 3 | Rejected-Finance 3 | |
| 4 | 4₹9.0 L+₹66,135 (7.96%)Rejected-Finance | 4 | Rejected-Finance 4 | |
| 5 | 5₹9.3 L+₹95,519 (11.5%)Rejected-Finance | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | ARTIST BRO L3 | M/s Virendra Singh Contractor L8 | M/S FAIR CONSTRUCTION L2 | M/S SANJEEV KUMAR CONTRACTOR L4 | M/S RINKU CONTRACTOR L6 | PRAGYA CONSTRUCTION L5 | M/s Prince Construction L9 | SHIV GANGA INFRATECH L7 | SANJAY KUMAR L10 | Phoughat Construction L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation in ordinary soil including all lead and lift with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 147 | Cum | 100 ₹14,700 | 75 ₹11,025 | 35 ₹5,145 Lowest | 50 ₹7,350 | 100 ₹14,700 | 85 ₹12,495 | 70 ₹10,290 | 58 ₹8,526 | 70 ₹10,290 | 75 ₹11,025 |
| 2.00 | Providing and laying C.C 1:3:6 with coarse sand aggregate in foundation with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 27 | Cum | 4,500 ₹1,21,500 | 4,000 ₹1,08,000 | 4,400 ₹1,18,800 | 3,500 ₹94,500 Lowest | 5,500 ₹1,48,500 | 4,450 ₹1,20,150 | 5,100.2 ₹1,37,705.4 | 5,395 ₹1,45,665 | 5,000 ₹1,35,000 | 3,500 ₹94,500 Lowest |
| 3.00 | Brick (M-100) Work in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 75 | Cum | 4,600 ₹3,45,000 | 4,500 ₹3,37,500 | 4,300 ₹3,22,500 | 6,500 ₹4,87,500 | 3,300 ₹2,47,500 Lowest | 4,500 ₹3,37,500 | 4,500.5 ₹3,37,537.5 | 4,900 ₹3,67,500 | 5,500 ₹4,12,500 | 3,500 ₹2,62,500 |
| 4.00 | Centering and shuttering for C.C. work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 29 | Sqm. | 400 ₹11,600 | 450 ₹13,050 | 80 ₹2,320 Lowest | 200 ₹5,800 | 500 ₹14,500 | 450 ₹13,050 | 165.7 ₹4,805.3 | 398 ₹11,542 | 300 ₹8,700 | 450 ₹13,050 |
| 5.00 | Centering and shuttering for R.C.C work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 56 | Sqm. | 400 ₹22,400 | 603 ₹33,768 | 85 ₹4,760 Lowest | 500 ₹28,000 | 500 ₹28,000 | 750 ₹42,000 | 500 ₹28,000 | 357 ₹19,992 | 800 ₹44,800 | 580 ₹32,480 |
| 6.00 | 12.5 mm Cement Plaster on brick masonry in 1:4 C.M. including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 76 | Sqm. | 140 ₹10,640 | 150 ₹11,400 | 50 ₹3,800 Lowest | 100 ₹7,600 | 196.25 ₹14,915 | 145 ₹11,020 | 150 ₹11,400 | 98 ₹7,448 | 140 ₹10,640 | 120 ₹9,120 |
| 7.00 | Providing and laying R.C.C 1:1:2 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. | 25 | Cum | 6,300 ₹1,57,500 | 6,700 ₹1,67,500 | 8,400 ₹2,10,000 | 4,000 ₹1,00,000 Lowest | 7,500 ₹1,87,500 | 6,650 ₹1,66,250 | 5,500 ₹1,37,500 | 7,550 ₹1,88,750 | 6,000 ₹1,50,000 | 6,000 ₹1,50,000 |
| 8.00 | Providing and laying C.C 1:2:4 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. | 10 | Cum | 5,300 ₹53,000 | 4,500 ₹45,000 | 5,000 ₹50,000 | 3,500 ₹35,000 | 6,000 ₹60,000 | 5,000 ₹50,000 | 5,500 ₹55,000 | 625 ₹6,250 Lowest | 5,500 ₹55,000 | 4,500 ₹45,000 |
| 9.00 | Steel Reinforcement with Bending, Binding, Cutting and Placing of Reinforcement including cost of Binding Wire with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 1.61 | M.T. | 65,000 ₹1,04,650 | 70,000 ₹1,12,700 | 56,000 ₹90,160 | 50,000 ₹80,500 | 60,000 ₹96,600 | 5,600 ₹9,016 Lowest | 65,000 ₹1,04,650 | 64,500 ₹1,03,845 | 70,000 ₹1,12,700 | 60,000 ₹96,600 |
| 10.00 | S/F 75 mm dia P V C Pipe for weep holes.all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 2.4 | RM | 100 ₹240 | 150 ₹360 | 110 ₹264 | 100 ₹240 | 150 ₹360 | 108 ₹259.2 | 150 ₹360 | 50 ₹120 Lowest | 1,000 ₹2,400 | 150 ₹360 |
Tender Value
₹13 L
EMD Value
₹26,000
Closing Date
18 Feb 2026, 12:00 pmClosed
Executive Engineer
U.M.B.D.G.C. Khurja
Contruction of VRB at Baroda Dy I km. 16.000
2026_UPIDC_1114437_1
14/EE/2025-26
Open Tender
Civil Works
Item Rate
60 days
U.M.B.D.G.C. Khurja
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹26,000
21 Apr 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation in ordinary soil including all lead and lift with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 147 | Cum | - | - |
| 2 | Providing and laying C.C 1:3:6 with coarse sand aggregate in foundation with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 27 | Cum | - | - |
| 3 | Brick (M-100) Work in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 75 | Cum | - | - |
| 4 | Centering and shuttering for C.C. work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 29 | Sqm. | - | - |
| 5 | Centering and shuttering for R.C.C work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 56 | Sqm. | - | - |
| 6 | 12.5 mm Cement Plaster on brick masonry in 1:4 C.M. including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 76 | Sqm. | - | - |
| 7 | Providing and laying R.C.C 1:1:2 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. | 25 | Cum | - | - |
| 8 | Providing and laying C.C 1:2:4 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. | 10 | Cum | - | - |
| 9 | Steel Reinforcement with Bending, Binding, Cutting and Placing of Reinforcement including cost of Binding Wire with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 1.61 | M.T. | - | - |
| 10 | S/F 75 mm dia P V C Pipe for weep holes.all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 2.4 | RM | - | - |
stage.html
html • 0.07 MB
technical_2066602.pdf
techsummary_2066602.pdf
finance_2066602.pdf
BOQ Comparative Chart
xlsx
finsummary_2066602.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_2066602.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .