Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance 1492 SECTOR 40 B CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹1.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.8 L+₹2,051.06 (1.16%)Rejected-Finance 1090 GROUND FLOOR SECTOR 18 C CHANDIGARH | ₹1.8 L+₹2,051.06 (1.16%) | L2 | Rejected-Finance not L1 |
| 3 | L3₹1.9 L+₹11,629.30 (6.57%)Rejected-Finance CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹1.9 L+₹11,629.30 (6.57%) | L3 | Rejected-Finance not L1 |
| 4 | L4₹1.9 L+₹17,583.35 (9.94%)Rejected-Finance 727 SECTOR 22 A CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹1.9 L+₹17,583.35 (9.94%) | L4 | Rejected-Finance not L1 |
Tender Value
₹2.0 L
EMD Value
₹3,983
Closing Date
20 Jul 2026, 11:00 amClosed
Executive Engineer, Electrical Division, M.C., Chd
Executive Engineer, Electrical Division, M.C., Chd
Repair and Maintenance of LED Panel Lights and Wall Fans in Municipal Corporation Building Sector- 17under Sub Division No. 2, M.C. Chandigarh
2026_MCC_93501_2
78/E/MCC/2026
Open Tender
Electrical Works
Percentage
45 days
Repair and Maintenance of LED Panel Lights and Wal
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,983
29 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and Fixing of LED luminarie recess/ surface mounting, Power coated housing made of CRCA sheet or its equivalent of size 2'x2' of 36-40 watt including driver with system Lumens 3600-4000 Im having efficacy of minimum 100 lm/W. THD <10%, PF > 0.95, Having coloured temperature 5700-6500 K recess type suitable to be fixed in Armstrong/ grid ceiling. The fitting should provides soft light and glare free symmetrical illumination and is to be fixed in the existing false ceiling frame of make Philips/ Wipro/ Osram/ Havells/ Trilux/ Mayfair/ Surya/ Twinkle alongwith connection, testing and commissioning etc. The fitting may be installed at the height of 20 feet. There should be a on site warranty for 5 years. This job also inclusive of all material required at site for entire satisfaction of Engineer-in-charge. | - | Nos. | 3,409 | - |
| 2 | S/E of Wall fans 300mm sweep without fan regulator of Panasonic-Flora Neo/ Havell's/ Usha/ Baja/ Orient make including making connection with 23/.076’ flexible wire to be adjacent fan point. The job shall be executed to the entire satisfaction of Engineer-in-charge. | - | Nos. | 3,546 | - |
| 3 | Supply & Erection of 18-20W LED Batten light with system Lumens 1800-2000 having efficacy 100 lm/W; THD <10%, Power factor >0.9, CCCV driver, Surge protection 2.5 kV; Operating Voltage Range - 100V - 300Volts. The luminaire housing should made of aluminium Extruded body. Ref- Make of Philips/ Osram/ Wipro/ Panasonic/ Crompton total system Power consumption 18-20 Watt complete in all respect as required. The fitting should provides Elegantly designed and glare free light and specification of LM-79 and LM-80. The fixture should be comprehensively warranted to be repaired or replaced for any defect within 1 years of installations. | - | Nos. | 966 | - |
| 4S/F modular type switch/socket: DSR 1.24 Supplying and fixing following modular switch /socket on the exisiting modular plate & switch box including connections but excluding modular plate Anchor-Penta make in recess etc as required. | |||||
| 4.1 | 5/6 Amp switch DSR 1.24.1 | - | Nos. | 88 | - |
| 4.2 | 15/16 Amp switch DSR 1.24.3 | - | Nos. | 141 | - |
| 5 | Supply and Erection of Ding Dong Bell. The work shall be executed to the entire satisfaction of Engineer in charge. | - | Nos. | 197 | - |
| 6 | Supply and Erection of Capacitor 1.85 MFD. The work shall be executed to the entire satisfaction of Engineer in charge. | - | Nos. | 59 | - |
| 7 | Supply and Erection of Capacitor 2.0 MFD. The work shall be executed to the entire satisfaction of Engineer in charge. | - | Nos. | 72 | - |
| 8 | Supply and Erection of Plug Top 5 Amp. The work shall be executed to the entire satisfaction of Engineer in charge. | - | Nos. | 66 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_115180.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .