Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.8 CrAdmitted-Finance 1 13 16 G KHAPARADEEH KOTHI CAMPUS CIVIL LINES AYODHYA UTTAR PRADESH 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | L1 | Admitted-Finance | ||
| 2 | L2₹11.9 Cr+₹1.1 Cr (9.99%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹11.9 Cr+₹1.1 Cr (10.5%)Admitted-Finance S 6 IIND FLOOR FRIENDS TRADE CENTRE NEHRU NAGAR AGRA | AGRA | UTTAR PRADESH | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹61.0 L
Closing Date
4 Jun 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Rampath se gudri bazar chauraha se saket sadan tak sadak saundarikaran ka karya
2026_DOLBU_1151195_1
192/NNA/2026
Open Tender
Civil Works
Percentage
365 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹41,300
MC
₹61.0 L
Google Meet
27 Jun 2026
20 May 2026
4 Jun 2026
20 May 2026
4 Jun 2026
20 May 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pathway
Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity. | 601.56 | Sqm | 23.25 | ₹13,986.27 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 322.38 | Cum | 1,438.53 | ₹4,63,753.3 |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 27 | Cum | 2,479.66 | ₹66,950.82 |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 20.05 | Sqm | 1,699.72 | ₹34,079.39 |
| 5 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 401.04 | Sqm | 91.99 | ₹36,891.67 |
| 6 | Taking out existing kerb stones of all types from footpath/ central
verge, including removal of mortar etc., disposal of unserviceable
material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 200 | Rm | 27.48 | ₹5,496 |
| 7 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 10 | Qtl | 3.95 | ₹39.5 |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. All kinds of soil | 194.4 | Cum | 123.94 | ₹24,093.94 |
| 9 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. Ditance upto 25 km | 459.67 | Cum | 352.48 | ₹1,62,024.48 |
| 10 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 601.56 | Cum | 489.12 | ₹2,94,235.03 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
RFP.pdf
Tender Documents • 2.78 MB
BOQ_2156237.xls
BOQ • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .