Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.7 LAccepted-AOC PLOT 411 GALI NO 9 GANDHI NAGAR GANDHI NAGAR 122001 | GANDHI NAGAR | GURUGRAM | HARYANA | 122001 | 1 | Accepted-AOC AOC | |
| 2 | 2₹12.9 L+₹21,876 (1.72%)Rejected-Finance C 46 OPP SECTOR 4 SURYA VIHAR GURUGRAM HARYANA | 2025 | 2 | Rejected-Finance 2 | |
| 3 | 3₹13.5 L+₹79,872 (6.29%)Rejected-Finance VPO DUMERKHA KALAN TEH NARWANA 126116 | DUMERKHA KALAN | JIND | HARYANA | 126116 | 3 | Rejected-Finance 3 |
| Sl No | Description | Qty | Unit | The V.K. Co-Operative Labour & Construction Society Limited L3 | THE JIYA CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED L1 | THE DAT GREENS COOPERATIVE L AND C SOCIETY LIMITED L2 |
|---|---|---|---|---|---|---|
| 2.00Upgradation of Electrical Infrastructure in South city-II A Block ward No-15 zone-1 under limit of Municipal Corporation Gurugram | ||||||
| 3.00 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | 440 | Metre | 112 ₹49,280 Lowest | 112 ₹49,280 Lowest | 112 ₹49,280 Lowest |
| 4.00 | Providing trench less boring below existing road / pavement including laying of 65 mm dia GI pipe B class required to complete the job in all respect | 50 | Metre | 60 ₹3,000 | 40 ₹2,000 Lowest | 860 ₹43,000 |
| 5.00 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | 200 | Metre | 100 ₹20,000 | 80 ₹16,000 Lowest | 395 ₹79,000 |
| 6.00 | Operation and Maintenance of 1and2 year free of cost | 1 | Each | 1 ₹1 Lowest | 1 ₹1 Lowest | - |
| 7.00 | Supply and erection of Sword type single Arm GI bracket with Big Ball on top and small Ball Complete in all respect including nut and bolts required for installation with suitable size of GI pole. | 10 | Each | 2,800 ₹28,000 | 2,700 ₹27,000 Lowest | 2,810 ₹28,100 |
| 8.00 | Buy Back Removing of Existing Pole / With bracket and Cable including exiting foundation dismantling with all labour and material required etc to complete the job in all respect up to the in entire satisfaction of Engineer-charge-of the work.... | 10 | Each | 2,500 ₹-25,000 Lowest | 2,500 ₹-25,000 Lowest | 2,500 ₹-25,000 Lowest |
| 9.00 | Erection Testing and commissioning of Three phase CCMS panel petty material required for installation of ccms panel i.e clamp,nut and bolts,thimble ,wire etc complete in all material required for installation on PCC pole or Pedstal. complete in all material required for installation on PCC pole or Pedstal. | 1 | Each | 2,000 ₹2,000 Lowest | 2,000 ₹2,000 Lowest | 2,000 ₹2,000 Lowest |
| 10.00 | Providing and fixing of 4G/5G Sim Card and recharse fees per month for street lights CCMS panel Compelte in all respect required for proper operation of CCMS panel. 500 Nos x 60 | 48 | Each | 77 ₹3,696 Lowest | 77 ₹3,696 Lowest | 77 ₹3,696 Lowest |
| 11.00 | Buy Back of old dismantalment flexible wire as per availbale at site. | 2,000 | Metre | 10 ₹-20,000 Lowest | 10 ₹-20,000 Lowest | 10 ₹-20,000 Lowest |
Tender Value
₹16.2 L
EMD Value
₹32,329
Closing Date
1 May 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Upgradation of Electrical Infrastructure in South city-II A Block ward No-15 zone-1 under limit of Municipal Corporation Gurugram.
2026_HRY_517303_1
2026AD7416EA 55BC 4B59 B4F7 11F90CB54ED4285ULB
Open Tender
Civil Works
Works
90 days
Gurugram
Upgradation of Electrical Infrastructure in South city-II A Block ward No-15 zone-1 under limit of Municipal Corporation Gurugram.
2 documents required · 2 mandatory
₹1,180
Yes
₹32,329
Yes
20 May 2026
24 Apr 2026
1 May 2026
24 Apr 2026
1 May 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Upgradation of Electrical Infrastructure in South city-II A Block ward No-15 zone-1 under limit of Municipal Corporation Gurugram | - | - | - | - |
| 3 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. | - | Metre | - | - |
| 4 | Providing trench less boring below existing road / pavement including laying of 65 mm dia GI pipe B class required to complete the job in all respect | - | Metre | - | - |
| 5 | Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables.. | - | Metre | - | - |
| 6 | Operation and Maintenance of 1and2 year free of cost | - | Each | - | - |
| 7 | Supply and erection of Sword type single Arm GI bracket with Big Ball on top and small Ball Complete in all respect including nut and bolts required for installation with suitable size of GI pole. | - | Each | - | - |
| 8 | Buy Back Removing of Existing Pole / With bracket and Cable including exiting foundation dismantling with all labour and material required etc to complete the job in all respect up to the in entire satisfaction of Engineer-charge-of the work.... | - | Each | - | - |
| 9 | Erection Testing and commissioning of Three phase CCMS panel petty material required for installation of ccms panel i.e clamp,nut and bolts,thimble ,wire etc complete in all material required for installation on PCC pole or Pedstal. complete in all material required for installation on PCC pole or Pedstal. | - | Each | - | - |
| 10 | Providing and fixing of 4G/5G Sim Card and recharse fees per month for street lights CCMS panel Compelte in all respect required for proper operation of CCMS panel. 500 Nos x 60 | - | Each | - | - |
| 11 | Buy Back of old dismantalment flexible wire as per availbale at site. | - | Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_596175.xls
BOQ • 0.28 MB
AD0161076.pdf
Additional Documents • 0.97 MB
OT0161076.pdf
Other Document • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .