Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹1.4 Cr+₹10,750.25 (0.08%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-original EMD, bid fee receipt etc not submitted at the Division office. |
| Sl No | Description | Qty | Unit | M/s M. Tayam Enterprises L2 | M/s Paho Enterprises L1 |
|---|---|---|---|---|---|
| 1.00SH: SITE CLEARANCE | |||||
| 1.01 | Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
(i) By Manual Means:-
In area of light jungle | 1.06 | Hec | 14,000 ₹14,840 Lowest | 14,000 ₹14,840 Lowest |
| 2.00SH: EARTH WORK | |||||
| 2.01 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 12,240 | Cum | 320 ₹39,16,800 Lowest | 320 ₹39,16,800 Lowest |
| 2.02 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | 12,240 | Cum | 373 ₹45,65,520 Lowest | 373 ₹45,65,520 Lowest |
| 3.00SH: KUTCHA DRAIN | |||||
| 3.01 | Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.) | 226.8 | Cum | 341 ₹77,338.8 Lowest | 341 ₹77,338.8 Lowest |
| 3.02 | Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with in all lifts and leads upto 1000 metres ) | 151.2 | Cum | 477 ₹72,122.4 Lowest | 477 ₹72,122.4 Lowest |
| 4.00SH: RCC Slab Culvert 2.00 Mtr. Span | |||||
| 4.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and utilised the remaining earth locally for road work.)
I. Ordinary Soil
a) Manual Means
upto 3m Depth | 421.28 | Cum | 169 ₹71,196.32 Lowest | 169 ₹71,196.32 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
25 Mar 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, PWD, Pakke Kessang Division
Office of the Executive Engineer, Pakke-Kessang Division, PWD
C/o Approach Road from NH-13 to Taroyar village in Pijeriang Circle, Pakke Kessang, East Kameng District.
2026_PWDAP_3199_1
PKD/PSD/NIT/BE/2025-26/10
Open Tender
Civil Works
Item Rate
730 days
Pakke Kessang
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer, Pakke-Kessang Division, PWD
₹1.4 L
Executive Engineer, Pakke Kessang Division, PWD
28 Mar 2026
18 Mar 2026
26 Mar 2026
18 Mar 2026
25 Mar 2026
18 Mar 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH: SITE CLEARANCE | |||||
| 1.01 | Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
(i) By Manual Means:-
In area of light jungle | 1.06 | Hec | 100 | ₹106 |
| 2SH: EARTH WORK | |||||
| 2.01 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 12,240 | Cum | 100 | ₹12,24,000 |
| 2.02 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | 12,240 | Cum | 100 | ₹12,24,000 |
| 3SH: KUTCHA DRAIN | |||||
| 3.01 | Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.) | 226.8 | Cum | 100 | ₹22,680 |
| 3.02 | Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with in all lifts and leads upto 1000 metres ) | 151.2 | Cum | 100 | ₹15,120 |
| 4SH: RCC Slab Culvert 2.00 Mtr. Span | |||||
| 4.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and utilised the remaining earth locally for road work.)
I. Ordinary Soil
a) Manual Means
upto 3m Depth | - | Cum | 100 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
SBD_TAROYAR.pdf
Tender Documents • 3.66 MB
BOQ_3396.xls
BOQ • 0.33 MB
DOC-20260324-WA0095.pdf
PDF • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .