Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC | L1 | Accepted-AOC ACCEPT |
| Sl No | Description | Qty | Unit | SRI GURUVAYURAPAN AND COMPANY L1 |
|---|---|---|---|---|
| 1.00 | Earth work deploying earth moving macinery for desilting channel and forming bund on either side and deposting the earth on banks including jungle clearanace etc complete | 124 | m3 | 40 ₹4,960 Lowest |
| 2.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc complete complying with standard specification. | 87 | m3 | 180 ₹15,660 Lowest |
| 3.00 | Cement concrete 1:4:5 (one cement four sand eight broken stone)using 40mm guage hard broken granite stone jelly for no more than 15cm thick compacting etc complete complying with standard. | 13.5 | m3 | 5,600 ₹75,600 Lowest |
| 4.00Centerin with steel plates for sides and soffits including all labour charges as per the direction of the departmental officers etc complete | ||||
| 4.01 | Matt sidewall centering | 32 | m2 | 280 ₹8,960 Lowest |
| 4.02 | Channel Sidewall | 510 | m2 | 340 ₹1,73,400 Lowest |
| 5.00 | Supply and fabrication of RTS rods in various dia including cutting bending and tying with will labour charges etc complete | 118 | Qtl | 9,300 ₹10,97,400 Lowest |
| 6.00 | Providing and laying in position of ready mix concrete 1:1.5:3 mix using Portland cement with water cement ratio not exceeding 0.45 including the use of pliastidizer of approved make and dosage required grade at all location and levels using 20mm ISS gauge HBBG metal and down graded aggregates in all type of works including hire charges for pump and pumping charges to required location. machine, vibrating, tapping, curing as specified charges conveyance for ready mixed concrete from RMC plant to site or required ( excluding cost of reinforcement, fabrication charges centering and shuttering ) mix by departmental officers etc complete as per IS 4926 of 1976/1990. | 147.5 | m3 | 7,600 ₹11,21,000 Lowest |
| 7.00 | Conveyance of excavated earth from site 0 to 15km lead including loading and unloading elements completed | 152 | m3 | 65 ₹9,880 Lowest |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
17 Jul 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of retaining wall at existing channel from Maduraiveeran kovil road Burial Ground to Sriram Colony in Ward No. 93 South Zone
2025_MAWS_578304_19
e36/2025 -Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As Per Tender Document
4 documents required · 4 mandatory
₹0
₹30,000
1 Nov 2025
5 Jul 2025
18 Jul 2025
5 Jul 2025
17 Jul 2025
5 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .