Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC KADAM KANAN JHARGRAM | JHARGRAM | WEST BENGAL | 721121 | L1 | Accepted-AOC Lowest Rate | |
| 2 | L2₹6.0 L+₹17,011 (2.90%)Rejected-Finance 211 2 NARAYANTALA EAST BAGUIHATI KOLKATA | KOLKATA | WEST BENGAL | 700001 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹6.0 L+₹17,304 (2.95%)Rejected-Finance GHORADHARA JHARGRAM | L3 | Rejected-Finance Higher than L1 |
Tender Value
₹5.9 L
EMD Value
₹11,732
Closing Date
12 Aug 2026, 2:00 pmClosed
The Executive Engineer, JMD, PHE Dte.
Raghunathpur, Jhargram
WBPHE/EE/JMD/NIeT 08_13 OF 2026-2027
2026_PHED_1035130_13
WBPHE/EE/JMD/NIeT 08 OF 2026-2027
Open Tender
Miscellaneous Works
Percentage
365 days
Jhargram
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,732
11 Sept 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
12 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hiring Charges of 7.5 KVA air cooling diesel generator set for auxiliary power at office of the DIC, MMSD(D), PHE Dte.
(w.e.f. 01-09-2026 to 31-08-2027) = 365 days. | 365 | / Day | 169 | ₹61,685 |
| 2 | Operation of 7.5 KVA diesel Generator set by engaging operating personnel having sufficient experience in operation as and when required & guarding of the generator set round the clock.This cost is excluding the cost of fuel & lubricant. (w.e.f. 01-09-2026 to 31-08-2027) = 365 days. | 365 | / Day | 684 | ₹2,49,660 |
| 3 | Supervision charges for Electrical installation by licensed electrician as per IE rules, 1956 read with latest amendments having valid worksmanship permit and mechanic for diesel generating set with overhead expenditure as per specification & direction of E.I.C. (w.e.f. 01-09-2026 to 31-08-2027) = 12 months. | 12 | / Month | 8,438 | ₹1,01,256 |
| 4 | Consumption of diesel for silent type air cooled robust canopy type 7.5 KVA capacity DG set @ 2.2 lit/hr. including all carriage & storage for average 2 hours run/day as per direction 365 x2 hours run/day = 730 hrs. (w.e.f. 01-09-2026 to 31-08-2027) = 365 days. | 730 | / Hour | 220.68 | ₹1,61,096.4 |
| 5 | Consumption of Mobil oil including all carriage & storage for the 7.5 KVA DG set for 365 days x 2 hrs., run/day = 730 hrs.
(w.e.f. 01-09-2026 to 31-08-2027) = 365 days. | 730 | / Hour | 9.7 | ₹7,081 |
| 6 | Add Cess @ 1 % | 0.01 | Item | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 0.59 MB
Tendernotice_3.pdf
PDF • 0.19 MB
BOQ_2543820.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .