Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.7 LAdmitted-Finance | ₹72.7 L | L1 | Admitted-Finance |
| 2 | L2₹73.0 L+₹25,871.06 (0.36%)Admitted-Finance NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | ₹73.0 L+₹25,871.06 (0.36%) | L2 | Admitted-Finance |
| 3 | L3₹81.5 L+₹8.8 L (12.1%)Admitted-Finance TS NO 1396 NORTH MAIN STREET PUDUKOTTAI 622 001 | PUDUKOTTAI | PUDUKOTTAI | TAMIL NADU | 622001 | ₹81.5 L+₹8.8 L (12.1%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical KHASRA NO 128 SWASTIK AGRO INDUSTRIES COMPOUND VILLAGE SAMPATPUR JAFARPUR RUDRAPUR UDHAM SINGH NAGAR UTTARAKHAND 263153 | UDAM SINGH NAGAR | UTTARAKHAND | 263153 | - | - | Rejected-Technical Technical eligibility criteria not satisfied |
| 5 | Rejected-Technical 0 DHULJI KI DHANI DESURIYAN VISHNOIYAN SURPURA JODHPUR JODHPUR RAJASTHAN 342304 | JODHPUR | RAJASTHAN | 342304 | - | - | Rejected-Technical Technical eligibility criteria not satisfied |
| Sl No | Description | Qty | Unit | M/s MSK Construction L2 | Rajendran Contractor L1 | SUN CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.01 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50m and lift up to 1.5m.etc. complete complying with standard specification and as directed by the departmental officers | 721 | SQM | 50 ₹36,050 | 60 ₹43,260 | 35 ₹25,235 Lowest |
| 2.01 | Earthwork excavation in hard soil for laying foundation concrete including necessary lead and lift for conveying the excess earth to far away from the monument premises etc., complete | 515 | CUM | 400 ₹2,06,000 | 500 ₹2,57,500 | 250 ₹1,28,750 Lowest |
| 3.01 | Laying Plain cement Concrete using 40mm stone jelly in ration 1:4:8, properly consolidating, curing etc.,complete | 43.78 | CUM | 9,001.84 ₹3,94,100.56 | 6,300 ₹2,75,814 Lowest | 7,300 ₹3,19,594 |
| 4.01 | Construction of random rubble stone masonry footings /dwarf wall with new RR stones and cement mortar 1:6, curing etc., complete | 332.18 | CUM | 8,525 ₹28,31,834.5 | 6,850 ₹22,75,433 Lowest | 7,300 ₹24,24,914 |
| 5.01 | Raising of Coursed rubble masonry dwarf wall (first sort) with hard stone in foundation and plinth with , etc. complete complying with standard specification and as directed by the departmental officers. | 104.29 | CUM | 9,000 ₹9,38,610 | 4,300 ₹4,48,447 Lowest | 9,000 ₹9,38,610 |
| 6.01 | Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand), etc. complete complying with standard specification and as directed by the departmental officers | 798.25 | SQM | 500 ₹3,99,125 | 450 ₹3,59,212.5 | 350 ₹2,79,387.5 Lowest |
| 7.01 | Providing and laying coping cover 50mm thick with using 20m stone jelly concrete in 1:2:4, over the C.R Stone Masonry dwarf Consolidating and top surface plastered with Cement Mortar 1:6 with proper slope, curing, etc. complete complying with standard specification and as directed by the departmental officers. | 231.75 | SQM | 2,000 ₹4,63,500 | 3,450 ₹7,99,537.5 | 990 ₹2,29,432.5 Lowest |
| 8.01 | Making, Supplying and fixing of Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works etc. complete complying with standard specification and as directed by the departmental officers.(As per attached drawing) | 628.5 | SQM | 3,000 ₹18,85,500 Lowest | 3,890 ₹24,44,865 | 5,850 ₹36,76,725 |
| 9.01 | Painting the surface with two coats of enamel paint including cost of all materials and labour cost etc.,complete | 618 | SQM | 160 ₹98,880 | 550 ₹3,39,900 | 150 ₹92,700 Lowest |
| 10.01 | Fixing the fencing post with proper alignment in Cement Concrete 1:2:4, consolidating curing etc. complete | 4.64 | CUM | 10,000 ₹46,400 | 6,500 ₹30,160 Lowest | 8,100 ₹37,584 |
Tender Value
₹82.4 L
EMD Value
₹2.1 L
Closing Date
4 Feb 2026, 3:00 pmClosed
SA,ASI, Trichy circle, Trichy
O/o SA,ASI, Trichy circle,Main guard gate, Trichy-620002
CONSTRUCTION OF DWARF WALL WITH BARBED WIRE FENCING TO THE PROPOSED MUSEUM BUILDING AT ADICHANALLUR-2025-26
2026_ASI_894013_1
T-15/13/2026-TRICHYCIRCLE
Open Tender
Civil Works
Works
ADICHANALLUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.1 L
Yes
9 Feb 2026
14 Jan 2026
5 Feb 2026
14 Jan 2026
4 Feb 2026
14 Jan 2026
14 Jan 2026 - 4 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Archaeological Survey of India, Trichy Circle, MainGuard Gate,Trichy-2
Name of Work: Construction of dwraf wall with barbed wire fencing to the proposed Museum Building at Adichanallur-2025-26
Contact No: 0431-2711258 (Rates should be quoted inclusive of GST )
Name of the Bidder/ Bidding Firm / Company :
Item No Description and specification of items of work to be executed Item Code / Make Specification / Quantities to be executed Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. P TOTAL AMOUNT TOTAL AMOUNT In Words
2.01 Earthwork excavation in hard soil for laying foundation concrete including necessary lead and lift for conveying the excess earth to far away from the monument premises etc., complete Item2 515 CUM Excess(+) Full Conversion INR 2.01 Earthwork excavation in hard soil for laying foundation concrete including necessary lead and lift for conveying the excess earth to far away from the monument premises etc., complete Item2 515 CUM
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_939695.xls
BOQ • 0.24 MB
RFP.pdf
Tender Documents • 14.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .