Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.6 LAccepted-AOC 0 HISAR HISAR HARYANA 125004 UDYAM HR 06 0052049 | HISAR | HARYANA | 125004 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹51.3 L+₹8.1 L (18.7%)Rejected-Finance | L2 | Rejected-Finance Not lowest | |
| 3 | L3₹52.5 L+₹9.2 L (21.3%)Rejected-Finance | L3 | Rejected-Finance Not lowest | |
| 4 | L4₹52.8 L+₹9.5 L (22.0%)Rejected-Finance BANKIM CHANDRA ROAD HAKIMPARA SILIGURI DIST DARJEELING PIN 734001 W B | JALPAIGURI | WEST BENGAL | 734001 | L4 | Rejected-Finance Not lowest | |
| 5 | L5₹53.1 L+₹9.8 L (22.8%)Rejected-Finance SHATYAM APPARTMENT 35 BALAI DAS CHATTERJEE ROAD HAKIMPARA SILIGURI 1 | JALPAIGURI | WEST BENGAL | 734001 | L5 | Rejected-Finance Not lowest |
| Sl No | Description | Qty | Unit | D.D. BROTHERS L3 | TAPASH SAHA L9 | M/S L N CHOWDHURY L7 | M/S SUBRATA JOARDAR L5 | M S ALOK SAHA L6 | Raj Enterprise L1 | ROY CONSTRUCTION AND CONSULTANCY L8 | M/S ASHWIRBAD WOODCRAFT L4 | LIBERAL ENGINEER CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (un reinforced) in ground floors and paving n. exc. 15 cm thickness (below or above ground level) removing rubbish off the premises etc complete all as specified and directed | 185.72 | CUM | 520 ₹96,574.4 | 552 ₹1,02,517.44 | 480 ₹89,145.6 | 517 ₹96,017.24 | 546 ₹1,01,403.12 | 350 ₹65,002 Lowest | 537 ₹99,731.64 | 533 ₹98,988.76 | 500 ₹92,860 |
| 2.00 | Demolition of concrete (reinforced) of any description and in any position not otherwise specifically provided for, removing rubbish off the premises etc complete all as specified and directed. | 20.63 | CUM | 520 ₹10,727.6 | 532 ₹10,975.16 | 455 ₹9,386.65 Lowest | 517 ₹10,665.71 | 546 ₹11,263.98 | 925 ₹19,082.75 | 537 ₹11,078.31 | 533 ₹10,995.79 | 500 ₹10,315 |
| 3.00 | Demolition of brick work built in cement mortar including all quoins arches, pillars etc but excluding ashlars facings, dressed stone work & precast concrete articles, removing unserviceable portion/debrish from site complete as specified and as directed. | 92.2 | CUM | 470 ₹43,334 | 482 ₹44,440.4 | 505 ₹46,561 | 466 ₹42,965.2 | 445 ₹41,029 | 480 ₹44,256 | 485 ₹44,717 | 435 ₹40,107 Lowest | 450 ₹41,490 |
| 4.00 | Demolition of Bricks (laid flat or on edge) or
brick tiles in floors, channels,kerbs, aprons, etc. (each layer) , laid, bedded and pointed in any
mortar, separating and stacking serviceable bricks for reuse and removing unserviceable portion complete all as specified and directed. | 14 | TEN SQM | 315 ₹4,410 | 337 ₹4,718 | 349 ₹4,886 | 310 ₹4,340 | 282 ₹3,948 | 150 ₹2,100 Lowest | 325 ₹4,550 | 275 ₹3,850 | 300 ₹4,200 |
| 5.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 111.88 | QTL | 315 ₹35,242.2 | 357 ₹39,941.16 | 321 ₹35,913.48 | 310 ₹34,682.8 | 325 ₹36,361 | 150 ₹16,782 Lowest | 325 ₹36,361 | 275 ₹30,767 | 300 ₹33,564 |
| 6.00 | Dismantling plain or corrugated steel sheeting any thickness, complete all as specified and directed. | 340 | SQM | 25 ₹8,500 | 27 ₹9,180 | 29 ₹9,860 | 25 ₹8,500 | 27 ₹9,180 | 25 ₹8,500 | 30 ₹10,200 | 26 ₹8,840 | 20 ₹6,800 Lowest |
| 7.00 | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion in concrete and making good disturbed ground complete all directed. (Note : Quoted rate also include for taking out old rusted/ unserviceable galvanised steel barbed wire or chain link fencing) | 682.5 | RM | 25 ₹17,062.5 | 27 ₹18,427.5 | 29 ₹19,792.5 | 26 ₹17,745 | 28 ₹19,110 | 20 ₹13,650 Lowest | 30 ₹20,475 | 27 ₹18,427.5 | 20 ₹13,650 Lowest |
| 8.00 | Taking down cement plaster or lime plaster on walls /ceiling of any description from concrete or brick wall etc including raking out joints, hacking for key, scrubbing down with water and disposing off the retrieved debris as directed including necessary scaffoldings etc complete all as specified and directed | 826 | SQM | 25 ₹20,650 | 27 ₹22,302 | 29 ₹23,954 | 25 ₹20,650 | 27 ₹22,302 | 25 ₹20,650 | 30 ₹24,780 | 26 ₹21,476 | 20 ₹16,520 Lowest |
| 9.00 | Excavating in post holes (or similar holes) each n exc 0.50 cum, getting out, returning filling in and ramming earth or broken rubble mixed with earth around in layers not exc 25cm, watering and removing surplus soil to a distance not exc 50 m and making good surfaces in soft/loose soil complete all as specified and as directed. | 195 | EACH | 200 ₹39,000 | 217 ₹42,315 | 226 ₹44,070 | 191 ₹37,245 | 202 ₹39,390 | 95 ₹18,525 Lowest | 210 ₹40,950 | 197 ₹38,415 | 185 ₹36,075 |
| 10.00 | Materials and Labour for Sand filling under floors or in foundation including watering and consolidation complete all as specified and as directed. | 8.55 | CUM | 815 ₹6,968.25 | 852 ₹7,284.6 | 888 ₹7,592.4 | 807 ₹6,899.85 | 853 ₹7,293.15 | 900 ₹7,695 | 840 ₹7,182 | 833 ₹7,122.15 | 780 ₹6,669 Lowest |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
19 Jun 2026, 6:00 pmClosed
GE SEVOKE ROAD
GE Sevoke Road Post Salugara Dist Jalpaiguri PIN 734008
REPAIRS TO FOOTPATH, BOUNDARY WALL, CULVERT AND ALLIED WORKS AT DIFFERENT LOCATIONS OF SEVOKE ROAD MIL STN UNDER GE SEVOKE ROAD
2026_MES_768361_1
8630/SEV OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE SEVOKE ROAD
As per Tender Documents
8 documents required · 8 mandatory
₹500
GE SEVOKE ROAD
₹96,000
21 Aug 2026
29 May 2026
22 Jun 2026
29 May 2026
19 Jun 2026
13 Jun 2026
30 May 2026 - 8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (un reinforced) in ground floors and paving n. exc. 15 cm thickness (below or above ground level) removing rubbish off the premises etc complete all as specified and directed | 185.72 | CUM | - | - |
| 2 | Demolition of concrete (reinforced) of any description and in any position not otherwise specifically provided for, removing rubbish off the premises etc complete all as specified and directed. | 20.63 | CUM | - | - |
| 3 | Demolition of brick work built in cement mortar including all quoins arches, pillars etc but excluding ashlars facings, dressed stone work & precast concrete articles, removing unserviceable portion/debrish from site complete as specified and as directed. | 92.2 | CUM | - | - |
| 4 | Demolition of Bricks (laid flat or on edge) or
brick tiles in floors, channels,kerbs, aprons, etc. (each layer) , laid, bedded and pointed in any
mortar, separating and stacking serviceable bricks for reuse and removing unserviceable portion complete all as specified and directed. | 14 | TEN SQM | - | - |
| 5 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 111.88 | QTL | - | - |
| 6 | Dismantling plain or corrugated steel sheeting any thickness, complete all as specified and directed. | 340 | SQM | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_860466.xls
BOQ • 0.32 MB
TENDERDOCUMENTS8630.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .