| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.8 LAccepted-AOC OMALUR TALUK SALEM DISTRICT | ₹74.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹81.5 L+₹6.7 L (8.99%)Rejected-Finance | ₹81.5 L+₹6.7 L (8.99%) | L2 | Rejected-Finance Above |
| 3 | L3₹86.9 L+₹12.2 L (16.3%)Rejected-Finance | ₹86.9 L+₹12.2 L (16.3%) | L3 | Rejected-Finance Above |
| 4 | L4₹87.1 L+₹12.4 L (16.5%)Rejected-Finance NO 6 173 2 EARIKARAI KALAPARAPATTY PO SALEM SOUTH TALUK VEMBADITHALAM VIA SALEM 637504 | SALEM | TAMIL NADU | 637504 | ₹87.1 L+₹12.4 L (16.5%) | L4 | Rejected-Finance Above |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
28 Aug 2024, 3:00 pmClosed
Executive Officer, Omalur Town Panchayat
Executive Officer, Omalur Town Panchayat
Restoration of Existing Damaged BT Road in Ward No.1 Thelungar Street-2 Ward No.8 Ambdkar Street Ist Cross ,Ward No.13 Kamaraj Nagar-6,11,12, Ward No.5 Angappan Nagar Main Street, Muniyappan Kovil Street and Saradha Nagar, Ward No.15 Kottai Mariyamma
2024_DTP_472982_1
211/2024/A1
Open Tender
Civil Works - Roads
Works
180 days
Omalur town panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.1 L
Omalur town panchayat
14 Sept 2024
14 Aug 2024
29 Aug 2024
14 Aug 2024
28 Aug 2024
14 Aug 2024
20 Aug 2024
Amount
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS1) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
R.Vasu (BID ID -1120508)
M.VIJAYAKUMAR (BID ID -1119298)
V P M PROJECTS (BID ID -1119305)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .