| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | R1₹33.5 LAccepted-Finance | R1 | Accepted-Finance Quoated in Lesser than Estimate Rate | |
| 2 | R2₹34.8 LRejected-Finance | R2 | Rejected-Finance Quoated in Higher than Estimate Rate |
Tender Value
₹33.6 L
EMD Value
₹33,700
Closing Date
17 Nov 2022, 3:00 pmClosed
Block Development Officer(V.Pt) Anakkavoor
Block Development Office(V.Pt) Anakkavoor
Execution of AGAMT II 2022-2023, Rejuvenation of Selliyamman Kulam , Construction of Drainage to Kattukudisai School Road ,Construction of Threshing Floor Near VPSC,Construction of Threshing Floor SF 512 in Kurumbur Panchacyat of Anakkavoor Block.
2022_RDTN_260584_2
Roc. No. 2156/2022/A13-11 Date. 06/10/2022 ANK1
Open Tender
Civil Works - Others
Item Rate
90 days
Block Development Office(V.Pt) Anakkavoor
Please refer Tender Documents.
3 documents required · 3 mandatory
₹0
₹33,700
Yes
21 Nov 2022
11 Nov 2022
17 Nov 2022
11 Nov 2022
17 Nov 2022
11 Nov 2022
Amount
Rejuvenation of Selliyamman Kulam ( Bathing ghat, inner pond) @ Kurumbur Panchayat AGAMT II 2022-23
Clearing light jungles including all charges
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Provision for Bathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
BABY POND LINING WALL
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Filling with good river sand including cost and conveyance of all materials and all labours chages etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Provision for Inlet
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Construction of Drainage to Kattukudisai School Road at Kurumbur Panchayat AGAMT II 2022-23
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Plastering with Cement Mortar 1:4 (one cement and five sand) 20 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Construction of Threshing Floor Near VPSC at Kurumbur Panchayat AGAMT II 2022-23
Earth work excavation for all foundation in all soils such aa red earth ,hard stiff clay soil,stiff black cotton soil,hard redearth,shales,murrams,gravel,hard rock not requiring blasting etc..
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Collection & Supply of US Gravel with 1 Km lead including cost and conveyance to the site and all labour etc complete.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C.1:3:6 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C.1:2:4 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Construction of Threshing Floor SF 512 at Kurumbur Panchayat AGAMT II 2022-23
Earth work excavation for all foundation in all soils such aa red earth ,hard stiff clay soil,stiff black cotton soil,hard redearth,shales,murrams,gravel,hard rock not requiring blasting etc..
Cement concrete 1:4:8 mix using 40mm HBGS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Collection & Supply of US Gravel with 1 Km lead including cost and conveyance to the site and all labour etc complete.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C.1:3:6 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C.1:2:4 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P.Anbazhagan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .