Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance R O NOBRA LEH | Admitted-Finance |
| 2 | Admitted-Finance R O BOGDANG | BOUDH | ODISHA | 762012 | Admitted-Finance |
| 3 | Admitted-Finance BOGDANG NUBRA BOGDANG BOGDANG LEH LEH JAMMU KASHMIR 194401 UDYAM LA 02 0000020 | LEH LADAKH | LADAKH | 194401 | Admitted-Finance |
| 4 | Admitted-Finance R O BOGDANG | Admitted-Finance |
| 5 | Admitted-Finance R O BOGDANG | Admitted-Finance |
Tender Value
₹24.6 L
EMD Value
₹49,200
Closing Date
26 Oct 2022, 4:00 pmClosed
Ex. Engineer PWD RnB Division Nobra
Ex. Engineer PWD RnB Division Nobra
CONSTRUCTION OF STAGE FOR MULTIPURPOSE STADIUM AT TURTUK under capex
2022_PWD_8127_3
PWD RnB/N/116 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Nubra
please read NIT
7 documents required · 7 mandatory
₹1,000
Payable To Ex. Engineer PWD RnB Division Nobra
₹49,200
Yes
31 Oct 2022
19 Oct 2022
27 Oct 2022
19 Oct 2022
26 Oct 2022
19 Oct 2022
Amount
Random rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) incl. carriage
Providing and laying in position specified grade of cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) incl. carriage
Kota stone slab 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm ( average) thick cement mortar 1:3 (1 cement:3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing, polishing and curing complete. incl. carriage
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. incl. carriage
Centering and shuttering including strutting, propping etc. and removal of form work for a. Columns, pillars, piers Abutments post and struts.
Earth work in rough excavation, banking excavated earth in layers not exceeding20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power rollerof minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m andlift upto 1.5 m in all kinds of soil: including carriage of earth for avg. lead of 2.0km.(complete job) Deduct for not rolling with power roller of 8tonne for banking excavated earth in layers not excavated earth in layers not exceeding 20cm in depth. Deduct for not watering the excavated earth for banking incl. carriage
M/S GHULAM HUSSAIN GOVT CONTRACTOR
M/S MOHD SASDI
M/S YAMAN BEE GOV CONTRACTOR
M/S MOHD ALI
M/S MOHD ALI GOVT CONTRACTOR
M/S ALI HASSAN
ghulam haider
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .