| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹67.1 LAdmitted-Finance | -21.73% | ₹67.1 L | L1 | Admitted-Finance |
| 2 | L2₹72.9 LAdmitted-Finance | -14.99% | ₹72.9 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical SRIKOLI TULASIPUR TENTULIGAON NIMAPARA | - | - | - | Rejected-Technical Technically not qualified |
Tender Value
₹85.8 L
EMD Value
₹85,800
Closing Date
10 Apr 2026, 3:00 pmClosed
Executive Engineer,Central Tender Cell
Central Tender Cell, UG Floor, ICOMC Tower, Satya Nagar
Regular repairs and maintenance of road in South-West Zone (Phase-1)
2026_ORULB_127509_3
BMC-EE-Tender Cell-84/2025-26 dt. 20.03.2026
Open Tender
Civil Works - Roads
365 days
BMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹85,800
Yes
Office chamber of the EE,Central Tender Cell
5 May 2026
24 Mar 2026
10 Apr 2026
24 Mar 2026
10 Apr 2026
24 Mar 2026
24 Mar 2026 - 2 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Labour for Removal of Cement Concrete Paver Blocks of different thickness & size/shape made by manualy over 50 mm thick Compacted bed of coarse sand ,and remove the sand from the surface and stacking for reuse etc, all complete as Per Driection of Engg -In -Charge. etc. complete. | - | Sqm | - | - | |
C:C: (1:3:6) using 4 cm. size H.G. C.B metal including the cost of all materials, labour carriage, royalty etc complete. | - | cum | - | - | |
Labou charge for Laying Factory made Chamfered edge Cement Concrete Paver Bliocks of required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , compacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as Per Manufacturers Specifications and Driection of Engg -In -Charge.excluding cost of 80mmm thick C.C. Paver Blocks of M-35 grade With approved colour design Pattern etc. complete. | - | Sqm | - | - | |
Providing and Laying Factory made Chamfered edge Cement Concrete Paver Blocks of required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as Per Manufacturers Specifications and Driection of Engg -In -Charge. 80mmm thick C.C. Paver Blocks of M-40 grade With approved colour design Pattern etc. complete. | - | Sqm | - | - | |
Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. and as per direction of E-I-C | - | cum | - | - | |
Earth work excavation in all kind of soil including moorum and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing and leveling the bed up to the required depth and depositing the excavated materials at places away from the work site with initial lead of 0.50 m and initial lift of 1.5m and laying in layers not exceeding to 0.30 m and breaking clods and as per direction of E-I-C | - | cum | - | - | |
Carriage of Excavated earth by mechanical means within 5 km lead including loading and unloading with all cost conveyance T & P sundries etc complete as per direction of Engineer- in-charge. | - | cum | - | - | |
Filling F&P with sand well watered and rammed. | - | cum | - | - | |
PCC in prop. (1:3:6) in foundation and bed using 4 cm size h.g C.B metal of approved quality and approved quarry including hoisting, lowering, laying concrete and compacting the same to required level, with compaction, watering and curing including cost, conveyance, royalties and taxes of all materials with cost of all labours, sundries and T & p such as hire charges of concrete mixer, concrete vibrator required for the work etc complete as per the specification and direction of EI-C | - | cum | - | - | |
M-20 grade using 20 mm size down grade H.G.C.B stone chips including the cost of all materials labour carriage, royalty etc complete. | - | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
DTCN.pdf
Tender Documents • 0.95 MB
BOQ_585960.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid