Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
22 Jun 2026, 5:30 pmClosed
- Anil Kumar Ram(DFLT)
MUNICIPAL COUNCIL, KHATGHORA
Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work Including05 Years of Operation and Maintenance of the Entire SystemInNagar Palika Parishad,KATGHORAunder SBM 2.0
191995
NIT/834/01/2026-27/Tech/NPP/Katghora_01.06.2026
RESTRICTED TENDER
WORKS
LUMPSUM
15 days
MUNICIPAL COUNCIL, KHATGHORA
Required Past Technical Experience: As Per NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
20 documents required · 20 mandatory
Urban Administration and Development Department (UADD)
WORKS
- Anil Kumar Ram(DFLT)
RESTRICTED TENDER
LUMPSUM
A B
MUNICIPAL COUNCIL, KHATGHORA
TENDER SECTION
CHIEF MUNICIPAL OFFICER,MUNICIPAL COUNCIL, KHATGHORA
450
15
No
1
191995
22 Jun, 2026 5:30:00 PM IST
10 Jul, 2026 10:30:00 AM IST
1 Jun, 2026 5:30:00 PM IST
NIT/834/01/2026-27/Tech/NPP/Katghora_01.06.2026
Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work Including05 Years of Operation and Maintenance of the Entire SystemInNagar Palika Parishad,KATGHORAunder SBM 2.0
237000.00 INR
Fixed Deposit Receipt (OFFLINE)
2
3 Jul, 2026 5:30:00 PM IST
AS PER NIT
AS PER NIT
As Per NIT
0.00 INR
20 documents required · 19 mandatory · 1 optional
₹0
₹2.4 L
22 Jun 2026
1 Jun 2026
10 Jul 2026
1 Jun 2026
3 Jul 2026
Lump Sum offer for Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work including 05 Years of Operation and Maintenance of The Entire System at Nagar Palika Parishad, Katghora Offer is inclusive of GST and all other applicable taxes etc. Total Lump-sum offer quoted by the bidder includes 05 years of Operation and Maintenance. The quoted rate shall be deemed bifurcated between construction and O&M as follows: (i) Design, Construction, Testing, Commissioning of all the Components of Interception and Diversion Based Sewage Treatment Plant (STP) work –87.57 % of quoted rate (ii) 05 Years of Operation and Maintenance of The Entire System –12.43 % of quoted rate.
UOM Name
Percentage
% of Cost of Bridge (excluding Maintenance) sanctioned by competent authority
Per mile
1000 piece
Per Diem Rate
MAN DAYS
Siemens Per meter
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.02 MB
6225053357489185678_191995_UWMSTPNIT.pdf
NIT • 29.68 MB
2790252659015907880_191995_GAD-DRAWINGS_KATGHORA_-20.pdf
NIT • 44.81 MB
3001790997558703780_191995_rfqItemUploadSORFormat_Katghora (1).xlsx
BOQ • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .