Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance | ₹2.6 L | L1 | Accepted-Finance Lower bid |
| 2 | L2₹2.6 L+₹1,823.11 (0.70%)Rejected-Finance 17 C LADHOWALI ROAD OPP G G S C SCHOOL JALANDHAR | ₹2.6 L+₹1,823.11 (0.70%) | L2 | Rejected-Finance Higher bid |
| 3 | L3₹2.7 L+₹4,979.54 (1.91%)Rejected-Finance | ₹2.7 L+₹4,979.54 (1.91%) | L3 | Rejected-Finance Higher bid |
Tender Value
₹2.7 L
Closing Date
18 Jun 2026, 2:00 pmClosed
Executive Engineer
Executive Engineer IIT Ropar
Providing and laying 300 mm diameter PVC pipes to mitigate waterlogging at various locations in the IIT Ropar campus
2026_IITRP_912553_1
IITRPR/EE/Q/25/323
Open Tender
Civil Works
Percentage
IIT Ropar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
22 Jun 2026
11 Jun 2026
19 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | - | - | - | - |
| 1.02 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | 2,434.25 | - |
| 1.03 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. | - | - | - | - |
| 1.04 | For thickness of tiles above 25 mm and up to 40 mm | - | sqm | 113.35 | - |
| 1.05 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 1.06 | All kinds of soil. | - | cum | 260.3 | - |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| 1.08 | 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 8,340.85 | - |
| 1.09 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| 1.1 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 6,189.65 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
PVC.pdf
Tender Documents • 0.24 MB
BOQ_959031.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .