| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAccepted-AOC | L1 | Accepted-AOC BEING LOWEST | |
| 2 | L2₹29.1 L+₹70,132 (2.47%)Rejected-Finance S 253 MANGOL PURI NEW DELHI 110083 | NEW DELHI | NORTH WEST DELHI | DELHI | 110083 | L2 | Rejected-Finance BEING NOT LOWEST | |
| 3 | L3₹32.5 L+₹4.1 L (14.5%)Rejected-Finance | L3 | Rejected-Finance BEING NOT LOWEST | |
| 4 | L4₹35.3 L+₹6.9 L (24.4%)Rejected-Finance WZ 30 1 ASALATPUR JANAKPURI NEW DELHI 110058 | WEST | DELHI | 110058 | L4 | Rejected-Finance BEING NOT LOWEST | |
| 5 | L5₹35.5 L+₹7.1 L (25.0%)Rejected-Finance | L5 | Rejected-Finance BEING NOT LOWEST |
| Sl No | Description | Qty | Unit | Kunal Construction Co. L7 | M/S Yamin L5 | yameen enterprises L3 | PG CONSTRUCTION AND COMPANY L6 | M/S DK Constructions co. L2 | GLOBAL DEVELOPERS COMPANY L4 | jain associates L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n.exc 1.5 m wide and not exceeding 1.5m deep for foundation etc. or for shafts, wells, cesspits, manhole, pier holes, laying of pipeline etc n. exc 10 sqm on plan and getting out any type of soil complete all as specified and as directed by Engr in Charge.
Note:-
Insurance of workmen, cleaning of site, removal of all hinderance's/obstructions, unforseen item, Electric cable, Gas Pipe line etc and permisssion from other department should be responsibility of contractor (MES will only assist in getting permission etc),restoring and getting the same constructed/Repaired/Replacement, nothing extra shall be payable. Complete all as specified & directed by Engr in Charge. (ii) Level Sheets/chart of proposed Sewer Line and Drain work Ground level to be provided by contractor before starting the work | 773 | cum | 150 ₹1,15,950 | 100 ₹77,300 | 199 ₹1,53,827 | 510 ₹3,94,230 | 20 ₹15,460 Lowest | 251 ₹1,94,023 | 80 ₹61,840 |
| 2.00 | All as per item No 1 above but exc 1.5 mtr and n.exc 3 mtr in any type of soil. | 10 | Cum | 1,000 ₹10,000 | 150 ₹1,500 | 299 ₹2,990 | 450 ₹4,500 | 100 ₹1,000 | 300 ₹3,000 | 80 ₹800 Lowest |
| 3.00 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc. 25 cm thick. Complete all as specified and as directed by Eng in Charge. | 138 | Cum | 10 ₹1,380 Lowest | 50 ₹6,900 | 49 ₹6,762 | 80 ₹11,040 | 35 ₹4,830 | 90 ₹12,420 | 18 ₹2,484 |
| 4.00 | Removal of excavated material from site beyond MoD lands and depositing where directed at a level not exceeding 1.5 meters above the starting point as directed by Engr-in-Charge. | 635 | Cum | 20 ₹12,700 Lowest | 50 ₹31,750 | 29 ₹18,415 | 150 ₹95,250 | 20 ₹12,700 Lowest | 70 ₹44,450 | 150 ₹95,250 |
| 5.00 | Material and labour for PCC (1:4:8) type D-2 (using 40 mm graded stone) aggregate as in foundation, flooring sub base complete all as specified and as directed at site by the Engineer-in-Charge. | 90 | Cum | 3,500 ₹3,15,000 | 1,200 ₹1,08,000 | 2,099 ₹1,88,910 | 3,450 ₹3,10,500 | 3,000 ₹2,70,000 | 3,200 ₹2,88,000 | 350 ₹31,500 Lowest |
| 6.00 | Material and labour for Brick work with sub class 'B' bricks straight or curved on plan exc. 6M mean radius built in CM (1:4) all as specified and as directed at site by the Engineer-in-Charge. | 200 | Cum | 4,500 ₹9,00,000 | 5,300 ₹10,60,000 | 4,399 ₹8,79,800 | 5,120 ₹10,24,000 | 3,200 ₹6,40,000 Lowest | 4,280 ₹8,56,000 | 4,000 ₹8,00,000 |
| 7.00 | Material and labour for PCC (1:2:4) type B-I (with 20 mm graded aggregate) as in coping, grouting, in post holes for MS frame made out of angle iron, kerbs/gola/haunching finished even and smooth without using extra cement as on brick work/flooring. Complete all as specified and as directed at site by the Engineer-in-Charge. | 17.48 | Cum | 4,500 ₹78,660 | 4,000 ₹69,920 | 5,999 ₹1,04,862.52 | 4,550 ₹79,534 | 3,000 ₹52,440 | 5,000 ₹87,400 | 550 ₹9,614 Lowest |
| 8.00 | M&L for plain Cement concrete type B2 1:2:4 using 40mm graded crushed stone aggregate in surface channels and drains etc. Complete all as specified and as directed by Engr in Charge. | 23.25 | Cum | 4,500 ₹1,04,625 | 3,000 ₹69,750 | 3,499 ₹81,351.75 | 3,000 ₹69,750 | 2,850 ₹66,262.5 | 3,500 ₹81,375 | 450 ₹10,462.5 Lowest |
| 9.00 | Extra for forming fair finished drain or channel 30 cm inner girth in cement concrete, using extra cement, including forms, moulds, mitred/stopped ends etc. Complete all as specified and directed by Engr in Charge. | 619 | RM | 10 ₹6,190 Lowest | 50 ₹30,950 | 29 ₹17,951 | 90 ₹55,710 | 110 ₹68,090 | 100 ₹61,900 | 250 ₹1,54,750 |
| 10.00 | M&L for rendering 15mm thick on fair faces of brick work or concrete surfaces in CM 1:4 finished even and smooth using extra cement complete all as specified and directed. | 1,300 | Sqm | 225 ₹2,92,500 | 210 ₹2,73,000 | 159 ₹2,06,700 Lowest | 171 ₹2,22,300 | 175 ₹2,27,500 | 190 ₹2,47,000 | 260 ₹3,38,000 |
Tender Value
₹43.5 L
EMD Value
₹86,900
Closing Date
28 May 2026, 6:00 pmClosed
GE (West) Delhi Cantt-10
GE (West) Delhi Cantt-10
Provn of Sewage Line and Drain at 262 Transit Camp under GE (West) Delhi Cantt-10
2026_MES_763690_1
GE/DW/TOKEN/04 OF 26-27
Open Tender
Civil Works
Item Rate
180 days
delhi
Class D Category a(ii)
9 documents required · 9 mandatory
₹500
GE (West) Delhi Cantt-10
₹86,900
Yes
2 Jul 2026
6 May 2026
30 May 2026
6 May 2026
28 May 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches n.exc 1.5 m wide and not exceeding 1.5m deep for foundation etc. or for shafts, wells, cesspits, manhole, pier holes, laying of pipeline etc n. exc 10 sqm on plan and getting out any type of soil complete all as specified and as directed by Engr in Charge.
Note:-
Insurance of workmen, cleaning of site, removal of all hinderance's/obstructions, unforseen item, Electric cable, Gas Pipe line etc and permisssion from other department should be responsibility of contractor (MES will only assist in getting permission etc),restoring and getting the same constructed/Repaired/Replacement, nothing extra shall be payable. Complete all as specified & directed by Engr in Charge. | 773 | cum | - | - |
| 2 | All as per item No 1 above but exc 1.5 mtr and n.exc 3 mtr in any type of soil. | 10 | Cum | - | - |
| 3 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc. 25 cm thick. Complete all as specified and as directed by Eng in Charge. | 138 | Cum | - | - |
| 4 | Removal of excavated material from site beyond MoD lands and depositing where directed at a level not exceeding 1.5 meters above the starting point as directed by Engr-in-Charge. | 635 | Cum | - | - |
| 5 | Material and labour for PCC (1:4:8) type D-2 (using 40 mm graded stone) aggregate as in foundation, flooring sub base complete all as specified and as directed at site by the Engineer-in-Charge. | 90 | Cum | - | - |
| 6 | Material and labour for Brick work with sub class 'B' bricks straight or curved on plan exc. 6M mean radius built in CM (1:4) all as specified and as directed at site by the Engineer-in-Charge. | 200 | Cum | - | - |
| 7 | Material and labour for PCC (1:2:4) type B-I (with 20 mm graded aggregate) as in coping, grouting, in post holes for MS frame made out of angle iron, kerbs/gola/haunching finished even and smooth without using extra cement as on brick work/flooring. Complete all as specified and as directed at site by the Engineer-in-Charge. | 17.48 | Cum | - | - |
| 8 | M&L for plain Cement concrete type B2 1:2:4 using 40mm graded crushed stone aggregate in surface channels and drains etc. Complete all as specified and as directed by Engr in Charge. | 23.25 | Cum | - | - |
| 9 | Extra for forming fair finished drain or channel 30 cm inner girth in cement concrete, using extra cement, including forms, moulds, mitred/stopped ends etc. Complete all as specified and directed by Engr in Charge. | 619 | RM | - | - |
| 10 | M&L for rendering 15mm thick with ready mix mortar on new / old brick or concrete surface, finished even and smooth without using extra cement complete all as specified and as directed by Engr in Charge. | 1,270.24 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_855428.xls
BOQ • 0.72 MB
PS04.pdf
Tender Documents • 1.06 MB
CREDITAMENDMENT.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .