Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | ₹10.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹10.2 LAccepted-Finance | ₹10.2 L | L2 | Accepted-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
3 Mar 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Buildings C and M South Presidency Division Chepauk Chennai 5
Special Repairs to lawn arrangements at main entrance in PWD Campus Chepauk Chennai 05
2026_PWD_668243_1
TNPWD/58-07/40M/2025-2026
Open Tender
Civil Works
60 days
Chepauk Chennai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
4 Mar 2026
28 Feb 2026
3 Mar 2026
28 Feb 2026
3 Mar 2026
28 Feb 2026
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with conveyed earth in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. - Mixing by manual means
Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
Brick work in Cement Mortar 1:6 using best quality Burnt Clay Brick of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers.
Paving the floor with best approved quality fine Special Stone Slabs - Semi Polished with Machine Cut Edges of all sizes of 40 mm thick with machine cut edges laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs with required cement slurry and laid in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments etc., The Special type of stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Up rooting the vegetation weeds by digging the area to a depth not less than 30cm, removing all weeds and other growth with root by forking repeatedly. Breaking clods, rough dressing, flooting with water uprooting fresh growth after 10 to 15days and then fine dressing for planting new grass disposal of all rubbish with all leads and lifts.
Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supply and filling of good quality Garden soil in the ratio of 2:2:1 of good quality existing earth, mixed with Red soil, FYM with all bio organic fertiliserorganic pesticides, fungicides, nutrients and plant growth regulators, etc.
Supply of well decomposed Farm yard Manure in a powdery form, devoid of soil sand, stones, plastics and other materials, highly nutrient and which supports plant growth
Supply and turffing of Korean grass / mexican grass for 45 Sq Ft including loading and unloading charges, transportation, stacking of saplings at site, earth work excavation of required size, Supply and planting of sapling, refilling of excavated earth etc as directed by the site in- charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_802879.xls
BOQ • 0.29 MB
CONDITION7.pdf
Tender Documents • 0.46 MB
Download all tender documents and submit your bid