Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC RANGAMATI EAST PO RUPNARAYANPUR BAZAR DIST PASCHIM BARDHAMAN WEST BENGAL | PASCHIM BARDHAMAN | WEST BENGAL | 713386 | ₹3.0 L | L1 | Accepted-AOC On being L1 and TC recommendations. |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 4 | Rejected-Technical VILL AMDIHA PO LALGANJ DIST PASCHIM BARDHAMAN STATE WEST BENGAL PIN 713359 | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | - | - | Rejected-Technical L4 |
| 5 | Rejected-Technical 4TH FLOOR B K MARKET BACK SIDE PREMISES NO 16 B SHAKESPEARE SARANI KOLKATA 700071 | KOLKATA | KOLKATA | WEST BENGAL | 700071 | - | - | Rejected-Technical L3 |
Tender Value
₹4.7 L
EMD Value
₹6,000
Closing Date
16 May 2026, 5:00 pmClosed
Area Engineer Civil, Salanpur Area
Office of the General Manager, Salanpur Area, Lalganj. 713359
Renovation of Samsan Kali mandir at north side of the mine near Sarishatali village under G.Begunia colliery
2026_ECL_359033_1
SLN/GM/AE(C)/E-Tender/26-27/04 Dated 05.05.2026
Open Tender
Civil Works - Buildings
Percentage
45 days
Gourangdi Begunia Colliery
As per tender documents
3 documents required · 3 mandatory
₹6,000
4 Aug 2026
5 May 2026
18 May 2026
6 May 2026
16 May 2026
6 May 2026
6 May 2026 - 9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | cum | 190.35 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | - | cum | 150.2 | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | 1,098.15 | - |
| 4 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | - | sqm | 26.15 | - |
| 5 | P/L in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 5,816.85 | ₹5,816.27 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 1 | sqm | 305 | ₹304.97 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | 750.5 | - |
| 8 | P/L in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 1 | cum | 7,386.6 | ₹7,385.86 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 8,764.7 | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | 573.25 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.23 MB
Tendernotice_2.pdf
PDF • 0.87 MB
BOQ_371904.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .