| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹4.0 L (3.04%)Admitted-Finance | ₹1.3 Cr+₹4.0 L (3.04%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | srmconstructions L1 | M Alli L2 |
|---|---|---|---|---|---|
| 1.00Name Of Work : Improvements To The Road From Kulivalavu Othakadai Road To Nevarikadu Road Km 0/00 - 2/020 | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 2,172.2 | Sqm | - | - |
| 3.00 | Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000m as per Technical spceification clause 301.4 | 2,514.12 | Sqm | - | - |
| 4.00Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000m Excavation for road work with hydraulsic excavator of 0.9 cum bucket capacity including cuting and loading in tippers, trimming bottom and side slopes in accordance with requirments of lines, grades and cross- sections, and transporting to the embankment location with a lift upto 1.50 m and lead upto 1000m as per technical specification clause 302.3 | |||||
| 5.00 | KM 0/0- 1/0 | 58.3 | Cum | - | - |
| 6.00 | KM 1/0- 2/0 | 53.93 | Cum | - | - |
| 7.00 | KM 2/0- 2/020 | 0.3 | Cum | - | - |
| 8.00Construction of embankment with Material obtained from Road way cutting Construction of Embankment with approved materials deposited at site from road way cuting and excavation from Drain and foundation of other structures graded and compacted to meet requirement of table 300.1 and 300.2 as per MORD Technical specifiation clause 301.5 (Filling with cut Earth) | |||||
| 9.00 | KM 0/0- 1/0 | 58.3 | Cum | - | - |
| 10.00 | KM 1/0- 2/0 | 53.93 | Cum | - | - |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
11 Jun 2020, 3:00 pmClosed
Project Director
DRDA, Namakkal
1 road work at Kolli Hills Block in Namakkal District under PMGSY III Batch I Package No.TN 10-150
2020_RDTN_92556_1
TN10150
Open Tender
Civil Works - Roads
Piece-work
180 days
Kolli Hills
Class I
3 documents required · 3 mandatory
₹0
₹2.8 L
Yes
19 Jun 2020
15 May 2020
11 Jun 2020
15 May 2020
11 Jun 2020
22 May 2020
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Picking BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000m as per Technical spceification clause 301.4
Excavation in soil using Hydraulic Excavator and Tippers with disposal upto 1000m Excavation for road work with hydraulsic excavator of 0.9 cum bucket capacity including cuting and loading in tippers, trimming bottom and side slopes in accordance with requirments of lines, grades and cross- sections, and transporting to the embankment location with a lift upto 1.50 m and lead upto 1000m as per technical specification clause 302.3
Construction of embankment with Material obtained from Road way cutting Construction of Embankment with approved materials deposited at site from road way cuting and excavation from Drain and foundation of other structures graded and compacted to meet requirement of table 300.1 and 300.2 as per MORD Technical specifiation clause 301.5 (Filling with cut Earth)
Construciton of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site, spreading grading to required slope and compacted to meet reaquirement of table 300.2 with lead upto 1000 m as per technical specifation clause 303.1(using borrow pit earth)
Gravel shoulder - Construction of embankment with approved materials deposited at site from road way cutting and excavation from drain and foundatoin of other structures graded and compacted to meet reauirement of tables 300.1 and 300.2 as per technical specification clause 301.5 (Gravel shoulder)
Wet Mix Macadam - Providing, laying, spreading and compacting graded stone agreegate to wet mix macadam spcification including premixing the material with water at OMC in machanical mixer (pug mill) etc.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 502.
Premix carpet Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
SEAL COAT Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
NEW TECHNOLOGY (ZYCOTHERM)
Prime Coat (High porosity)
Providing and applying primer coat with cationic bitumen emulsion(water based) modified with Nanotechnology based Penetrative Reactive Water-soluble Organosilane material (forming water clear solution) qualifying as per the test, on prepared surface of granular base including cleaning of road surface and prime coat-mix made using 100 part Cationic Bitumen Emulsion (Grade CSS-1) and 200 parts of Nanotechnology Solution (1 kg Terraprime :200 liter water (?1000ppm TDS) and spraying at the rate of 1.35 Kg/sqm using mechanical means as per Technical Specification.
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder with ZycoTherm
Providing, laying and rolling of 20mm thick open-graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder with Nanotechnology based Organosilane Reactive Aggregate modifier material qualifying as per the test at the rate of 1 Kg per 1 ton of Binder. Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade or emulsion grade with Nanotechnology based material to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. (ref:Mord pg.no 5-24).
Seal Coat (ZycoTherm)
Providing and laying of Seal coat modified with Nanotechnology based Organosilane Reactive Aggregate modifier material qualifying as per the test at the rate 1 Kg per 1 ton of Binder and sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per technical specification Clauses 510.
Provision of Rumble strips with premix Bituminous carpet
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Providing and fixing Name board
Providing and Fixing 'Logo' of PMGSY Project
Providing and Fixing 'Citizen information Board' of PMGSY Project
Providing and Fixing 'Maintenance information Board' of PMGSY Project
Providing and fixing of cautionary, mandatory and informatory sign board
Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet Fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60cm below Ground Level etc Complete including 7 years warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 Specification (as per MORT & Spec. No. 801)
90 Cm Equilateral triangle (Cautionary) sign Board
60 Cm Circular (Mandatory) sign Board
Chevron Signs 90 cm Octagon (stop sign)
Reflector
Road Marking with hot applied hermoplastc Compound with Reflectorising Glass Beads on Bituminous Surface
Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(ii) Ordinary Kilometer Stone (Precast)
(iii) 200 m stone (precast)
(iv) Guard Stone
Construction Of Retainning Wall
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
CH 20-70 (LHS Side)
CH 1530 - 1590 (LHS Side)
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
CH 20-70 (LHS Side)
CH 1530 - 1590 (LHS Side)
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
CH 20-70 (LHS Side)
CH 1530 - 1590 (LHS Side)
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)
CH 20-70 (LHS Side)
CH 1530 - 1590 (LHS Side)
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)
CH 20-70 (LHS Side)
CH 1530 - 1590 (LHS Side)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
CH 20-70 (LHS Side)
CH 1530 - 1590 (LHS Side)
Filter media behind abutment, wing wall and return wall complete as per drawing and Technical Specification
CH 20-70 (LHS Side)
CH 1530 - 1590 (LHS Side)
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M Alli
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
18-150.pdf
Tender Documents • 0.90 MB
BOQ_158622.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .