Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹7.3 L+₹9,460.01 (1.31%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹7.5 L+₹28,917.53 (4.01%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹7.9 L+₹68,692.59 (9.54%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹8.4 L+₹1.2 L (16.3%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.8 L
EMD Value
₹21,500
Closing Date
22 Jul 2026, 4:00 pmClosed
Executive Engineer RnB Handwara
XEN HAND
Construction of Chokidar Shed at SWM facility at MC Handwara
2026_PWDJK_316065_1
NIT NO 21 OF 2026-27
Open Tender
Civil Works
Percentage
30 days
Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer RnB Handwara
₹21,500
Yes
23 Jul 2026
15 Jul 2026
23 Jul 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures ( drains, retaining walls, toe walls , Breast walls) as per drawings and technical specfication incl. setting out, construction of shoring and bracing ,removal of stumps and other deleterious matter dressing of sides and bottom,backfilling the excavated earth to the extent required and utlizing the remaining earth locally for road work complete | 40.5 | cum | 256.85 | ₹10,402.43 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, | 88.5 | cum | 187 | ₹16,549.5 |
| 3 | P/L dry Stone Soling duly hand packed (Quarry) & consolidated with hand rammers incl.all carriage complete Job. | 3.55 | cum | 850 | ₹3,016.65 |
| 4 | P/L of cement concrete of (1:4:8) nominal size stone agg. 40mm including cost of carriage complete. | 4.5 | cum | 5,552 | ₹24,984 |
| 5 | Providing and laying in position specified grade of Mass concrete cement concrete excluding cost of centering, shuttering, finishing and inforcement. All work upto plinth level 1:2:4 mix with 20mm nominal size stone aggregate (crushed aggregate) complete job. | 23.3 | cum | 6,900 | ₹1,60,770 |
| 6 | Brick work with common burnt clay F.S.C. moulded perforated bricks of class designation 12.5 conforming to I:S: 2222 in Superstructure above plinth level upto floor five level in cement mortar 1:6 ( 1 cement : 6 coarse sand ) and curing complete in: With (non-modular) bricks including carriage COMPLETE JOB. | 19.51 | cum | 9,500 | ₹1,85,345 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: | - | - | - | - |
| 8 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 88.3 | Sqm | 286.35 | ₹25,284.71 |
| 9 | Suspended floors, roofs, landings, balconies and access platforms. | 44.9 | Sqm | 718.2 | ₹32,247.18 |
| 10 | Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 17.3 | Sqm | 577 | ₹9,982.1 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_1028680.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .