Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-Finance | ₹31.5 L | L1 | Accepted-Finance Lowest One |
| 2 | L2₹33.2 LRejected-Finance | ₹33.2 L | L2 | Rejected-Finance Not Lowest One |
| 3 | L3₹34.6 LRejected-Finance RANGNATH NAGAR AMBAD ROAD JALNA | JALNA | JALNA | MAHARASHTRA | ₹34.6 L | L3 | Rejected-Finance Not Lowest One |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| Sl No | Description | Qty | Unit | SACHIN ENTERPRISES L3 | Mangalmurti Enterprises L1 | Orion Infratech Group L2 |
|---|---|---|---|---|---|---|
| 1.00Sub Estimate | ||||||
| 1.01 | Electrician | 79 | Number | 900 ₹71,100 | 580 ₹45,820 Lowest | 600 ₹47,400 |
| 2.00HIRE CHARGES OF MACHINERIES | ||||||
| 2.10 | Rent for Concrete breaker & Compressor | 12 | Per Day | 8,000 ₹96,000 | 2,900 ₹34,800 Lowest | 3,145 ₹37,740 |
| 2.20 | Rent for poclain | 112 | Hours | 2,800 ₹3,13,600 | 2,400 ₹2,68,800 Lowest | 2,575 ₹2,88,400 |
| 2.30 | Rent for Crane | 80 | Hours | 800 ₹64,000 Lowest | 1,600 ₹1,28,000 | 1,690 ₹1,35,200 |
| 2.40 | Rent for JCB | 600 | Hours | 800 ₹4,80,000 Lowest | 1,200 ₹7,20,000 | 1,260 ₹7,56,000 |
| 2.50 | Truck hire charges upto 20 km | 79 | Per Day | 6,500 ₹5,13,500 | 2,780 ₹2,19,620 Lowest | 2,920 ₹2,30,680 |
| 2.60 | Jeep hire Charges with driver (Upto 300 Km)& fuel | 79 | Per Day | 3,300 ₹2,60,700 Lowest | 3,450 ₹2,72,550 | 3,820 ₹3,01,780 |
| 2.70 | Pipe cutter with operator | 30 | Per Day | 1,500 ₹45,000 Lowest | 1,500 ₹45,000 Lowest | 1,515 ₹45,450 |
Tender Value
₹36.9 L
EMD Value
₹36,900
Closing Date
21 Aug 2026, 5:00 pmClosed
Superintending Engineer Mumbai
Office of the Superintending Engineer Mumbai MIDC Mumbai
Removal of encroachment unauthorized construction from reserve open space road sides in A R K Blocks in TTC indl. Area.
2026_MIDC_1325900_1
MIDC/Encroachment/Tender/26-27
Open Tender
Civil Works
Item Rate
365 days
TTC Indl Area Mahape
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹36,900
25 Aug 2026
7 Aug 2026
25 Aug 2026
7 Aug 2026
21 Aug 2026
16 Aug 2026
8 Aug 2026 - 11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub Estimate | |||||
| 1.01 | Electrician | - | Number | 668 | - |
| 2HIRE CHARGES OF MACHINERIES | |||||
| 2.1 | Rent for Concrete breaker & Compressor | - | Per Day | 3,495 | - |
| 2.2 | Rent for poclain | - | Hours | 2,862 | - |
| 2.3 | Rent for Crane | - | Hours | 1,879 | - |
| 2.4 | Rent for JCB | - | Hours | 1,401 | - |
| 2.5 | Truck hire charges upto 20 km | - | Per Day | 3,243 | - |
| 2.6 | Jeep hire Charges with driver (Upto 300 Km)& fuel | - | Per Day | 4,243 | - |
| 2.7 | Pipe cutter with operator | - | Per Day | 1,681 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.57 MB
TenderDocument.pdf
Tender Documents • 0.26 MB
BOQ_2270746.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].