Tender Value
₹74.4 L
EMD Value
₹1.5 L
Closing Date
2 May 2022, 6:00 pmClosed
Joint General Manager (Engg-Elect)-I
Joint General Manager (Engg-Elect), AAI, Chennai Airport, Chennai-600 016
Replacement/Augmentation of ALCMS System including AICMC for Five Years at Chennai Airport
2022_AAI_111648_1
AAI/CHE/AMED-I/2021-22/01
Open Tender
Electrical Works
Works
90 days
CHENNAI AIRPORT
As per e-NIT
11 documents required · 11 mandatory
₹1,120
₹1.5 L
17 Jan 2023
4 Apr 2022
4 May 2022
5 Apr 2022
2 May 2022
5 Apr 2022
5 Apr 2022 - 18 Apr 2022
Amount
SH-I: SITC of ALCMS
Design, Supply, Installation, Testing & Commissioning of Airport Lighting Control & Monitoring System (ALCMS), Type 'L 890 BB' to the requirements of FAA Advisory Circular No. AC 50 / 5345 - 56B (Current edition) and additional circuits / mechanisms / interfaces for control & monitoring of Constant Current Regulators (CCRs) installed for various visual aids of both main runway and secondary runway & other ancillary lighting aids such as Landing - H, Isolation Bay Flood lighting, Beacon light etc. as mentioned in Annexure-A & network diagram, maintaining data and event log records, suitable interface to make them compatible with ALCMS, Data & Power Cabling, Earthing etc., including PLC and I/O modules, all hardwares and softwares, licenses & other items as required for successful operation of the ALCMS system etc., complete as required to ensure failsafe, expandable and future proof system.
SH II : Miscellaneous Works
Supply and laying of Single Mode (OS 1) 12 core, armoured Optic Fibre Cable (OFC) (ISI marked) conforming to ITU-T G.652 and IEC-60794 with up to date amendments, etc., through existing HDPE pipe of 40 mm dia complete as required.
Supply and laying of HDPE pipe of PN 6 and PE 100 of 40mm dia (OD) size ISI marked, HDPE pipe along with all accessories like socket, bend, couplers etc., conforming to IS 14930, Part II with up to date amendments in the existing existing RCC / HUME / metal pipe / masonary duct complete as required.
Supply and laying of HDPE pipe of PN 6 and PE 100 of 40mm dia (OD) size ISI marked, HDPE pipe along with all accessories like socket, bend, couplers etc., conforming to IS 14930, Part II with up to date amendments on wall surface/cable tray with necessary Clamps/Cable ties at required intervals complete as required.
Supply and laying of 8 Core x 1.5 sqmm Control cable solid annealed plain copper conductor, XLPE insulated PVC innersheathed single layer of galvanished flat steel strip armoured and over all PVC sheathed 1.1KV grade confirming IS 7098 Part-I amended upto date, laying in the existing existing RCC / HUME / metal pipe / masonary duct complete as required.
SH III: AICMC OF ALCMS
All Inclusive Comprehensive Maintenance (AICMC) of complete ALCMS & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out Quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and instructions of Engineer-in-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts.
First Year (after Completion of DLP) Rate for First Year after DLP = 3 % of SH-I i.e. SITC cost of ALCMS SH - I Sl. No. 1.01
Second Year (after Completion of DLP) Rate for Second Year after DLP = 5 % escalation of SH-III Sl. No. 3.02 cost
Third Year (after Completion of DLP) Rate for Third Year after DLP = 5 % escalation of SH-III Sl. No. 3.03 cost
Fourth Year (after Completion of DLP) Rate for Fourth Year after DLP = 5 % escalation of SH-III Sl. No. 3.04 cost
Fifth Year (after Completion of DLP) Rate for Fifth Year after DLP = 5 % escalation of SH-III Sl. No. 3.05 cost
AMA Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .