Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -48.55% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance | -47.11% | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.6 LAdmitted-Finance | -47.00% | ₹1.6 L | L3 | Admitted-Finance |
| 4 | L4₹1.8 LAdmitted-Finance | -40.00% | ₹1.8 L | L4 | Admitted-Finance |
| Rank | Bidder | Quote | Total Amount |
|---|---|---|---|
| L2 | BANTI CHOUDHARY Bid ID 2707881 | 47.11% below | ₹1,55,708.44 |
| L1 | SURESTA CHOUDHARY Bid ID 2707895 | 48.55% below | ₹1,51,469.07 |
| L4 | SANTOSH KUMARI Bid ID 2708174 | 40% below | ₹1,76,643.26 |
| L3 | M/S BAJWA TILE INDDUSTRY Bid ID 2707887 | 47% below | ₹1,56,032.28 |
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
27 Jan 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Construction of nallah from Om Parkash to Bachan lal land at Bahadurpur pyt Bahadurpur , Block arnia under Constituency Development Funds CDF for the year 2025-26
2026_RDPR_300563_1
e-NIT No. 742 REWJ of 2025-26 dated 13-01-2026
Open Tender
Civil Works
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,880
Yes
28 Jan 2026
14 Jan 2026
28 Jan 2026
14 Jan 2026
27 Jan 2026
14 Jan 2026
Earth work in excavation by MECH means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
supply and placing of boulders
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete.
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Foundations, footings, bases of columns etc. for mass concrete
suspended floors
carriage of sand by 35 kms av.
carriage of agg by 35 kms av.
stone
Add cost of Sigh Board and painting
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_975048.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid