| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹7.0 LAccepted-AOC | ₹7.0 L Quoted ₹7.8 L | l1 | Accepted-AOC CONTRACT AWARDED |
| 2 | Rejected-Technical KANJIKOVIL | KANJIKOVIL | - | - | Rejected-Technical Not Eligible |
| Sl No | Description | Qty | Unit | PKS CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and refilling the sides,cleaning and leveling the site, etc., complete complying with standard specification. | 17 | M3 | 500 ₹8,500 Lowest |
| 2.00 | Supplying and filling with M-Sand for basement to required thickness, watered, well rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 3.2 | M3 | 2,000 ₹6,400 Lowest |
| 3.00 | Supplying and filling with gravel for foundation and basement to required thickness, watered, well rammed and consolidated, etc., completed as directed by the departmental officers. | 20 | M3 | 600 ₹12,000 Lowest |
| 4.00 | Plain Cement Concrete 1:4:8 (One Cement, Four M-sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation and flooring the top surface rough to receive the floor including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification. | 5.2 | M3 | 6,000 ₹31,200 Lowest |
| 5.00 | Brick work in Cement Mortar 1:5 (one part cement and five parts M-sand) using best quality II class Ground moulded chamber burnt bricks of size 9" x 4-1/2" x 3" to line, level and to plumb on one face including necessary scaffolding, racking out joints, curing etc., complete as directed by the departmental officer and as per standard specification-for Foundation and Basement | 6.5 | M3 | 7,500 ₹48,750 Lowest |
| 5.01 | for above basement up to 4.50m height. | 8 | M3 | 2,500 ₹20,000 Lowest |
| 6.00 | Supplying , erection and steel centering for all RCC works using M.S Sheet, M.S. angles casurina props C.W.joints for all type of RCC works (ie) beams, roof slab, lintel, column footing, column & roof beam etc., including necessary supports with all cross bracing, filling the slits and holes the reprieved materials should be taken by the contractor and side shuttering etc., complete as directed by the departmental officers-upto basement-Column surface | 14 | M3 | 1,200 ₹16,800 Lowest |
| 6.01 | Plain surface | 14 | M2 | 1,500 ₹21,000 Lowest |
| 6.02 | above basement level 3.30m height -Plain surface | 15 | M2 | 1,950 ₹29,250 Lowest |
| 7.00 | Reinforced Cement Concrete 1:2:4 (One Cement, Two M-sand and Four hard broken stone jelly) using 20 mm gauge machine crushed hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. complete complying with standard specification and as directed by the departmental officers -for Foundation and Basement | 6 | M2 | 7,500 ₹45,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,800
Closing Date
1 Jun 2026, 11:30 amClosed
THE GENERAL MANAGER
Veerapandi Pirivu Tiruppur
civil work at asanallipalayam BMC
2026_TCMPF_676919_1
3630/ CIVIL/ ASANALLIPALAYAMBMC /25-26
Open Tender
Civil Works - Buildings
Works
120 days
ASANALLIPALAYAM AVINASI TIRUPPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹7,800
Yes
TIRUPUR DCMPU LTD
11 Aug 2026
13 May 2026
2 Jun 2026
13 May 2026
1 Jun 2026
13 May 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and refilling the sides,cleaning and leveling the site, etc., complete complying with standard specification. | 17 | M3 | - | - |
| 2 | Supplying and filling with M-Sand for basement to required thickness, watered, well rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 3.2 | M3 | - | - |
| 3 | Supplying and filling with gravel for foundation and basement to required thickness, watered, well rammed and consolidated, etc., completed as directed by the departmental officers. | 20 | M3 | - | - |
| 4 | Plain Cement Concrete 1:4:8 (One Cement, Four M-sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation and flooring the top surface rough to receive the floor including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification. | 5.2 | M3 | - | - |
| 5 | Brick work in Cement Mortar 1:5 (one part cement and five parts M-sand) using best quality II class Ground moulded chamber burnt bricks of size 9" x 4-1/2" x 3" to line, level and to plumb on one face including necessary scaffolding, racking out joints, curing etc., complete as directed by the departmental officer and as per standard specification-for Foundation and Basement | 6.5 | M3 | - | - |
| 5.01 | for above basement up to 4.50m height. | 8 | M3 | - | - |
| 6 | Supplying , erection and steel centering for all RCC works using M.S Sheet, M.S. angles casurina props C.W.joints for all type of RCC works (ie) beams, roof slab, lintel, column footing, column & roof beam etc., including necessary supports with all cross bracing, filling the slits and holes the reprieved materials should be taken by the contractor and side shuttering etc., complete as directed by the departmental officers-upto basement-Column surface | 14 | M3 | - | - |
| 6.01 | Plain surface | 14 | M2 | - | - |
| 6.02 | above basement level 3.30m height -Plain surface | 15 | M2 | - | - |
| 7 | Reinforced Cement Concrete 1:2:4 (One Cement, Two M-sand and Four hard broken stone jelly) using 20 mm gauge machine crushed hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. complete complying with standard specification and as directed by the departmental officers -for Foundation and Basement | 6 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
technicalbid.pdf
Tender Documents • 1.02 MB
BOQ_813373.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].