Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Fee/PreQual/Technical/Finance NO 12A KOTHARI NAGAR 1ST CROSS STREET RAMAPURAM CHENNAI 600 089 | KANCHIPURAM | TAMIL NADU | 600089 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹1.6 Cr+₹11.0 L (7.27%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹1.7 Cr+₹21.2 L (14.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹1.7 Cr+₹22.1 L (14.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹1.8 Cr+₹24.2 L (15.9%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SAMUNDEESWARI CONSTRUCTIONS L10 | B.M.J CONSTRUCTIONS L4 | M.NIRMALKUMAR L8 | P.BASKARAN&CO L5 | VIMALABAI CONSTRUCTION L3 | U3SANKAR & CO L11 | S.CHANDRASEKAR L2 | SHIVANAGAMMAI ENGINEERING CONTRACTORS L6 | SRI SEKAR CONSTRUCTIONS L1 | GS ASSOCIATES L7 | S.MOHAN L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials use ful for re-use for any thickness of Pressed tiles and weathering course etc.complete and as directed by the departmental officers. | 307 | Sqm | 28 ₹8,596 Lowest | 100 ₹30,700 | 49.2 ₹15,104.4 | 44.28 ₹13,593.96 | 40 ₹12,280 | 44.62 ₹13,699.69 | 300 ₹92,100 | 200 ₹61,400 | 45.37 ₹13,928.59 | 50 ₹15,350 | 43 ₹13,201 |
| 2.00 | Dismantling, clearing away and carefully stacking the materials useful for reuse of Brick / stone masonry in Cement mortar walls, add for every additional 3m or part there of over the initial height of 3m etc. complete complying with standard specfication and as directed by the departmental officers. | 17 | Cum | 30 ₹510 | 1,850 ₹31,450 | 32.01 ₹544.17 | 28.8 ₹489.6 | 26 ₹442 Lowest | 29.03 ₹493.56 | 450 ₹7,650 | 250 ₹4,250 | 1,418 ₹24,106 | 72 ₹1,224 | 28 ₹476 |
| 3.00 | Dismantling, clearing away and carefully stacking the materials useful for reuse of RCC works etc. complete complying with standard specfication and as directed by the departmental officers. | 6 | Cum | 4,050 ₹24,300 | 4,620 ₹27,720 | 4,610.06 ₹27,660.36 | 4,149.27 ₹24,895.62 | 3,725 ₹22,350 | 4,181.55 ₹25,089.31 | 2,300 ₹13,800 Lowest | 2,500 ₹15,000 | 2,481.5 ₹14,889 | 4,000 ₹24,000 | 4,050 ₹24,300 |
| 4.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 102 | Cu.m | 215 ₹21,930 | 315 ₹32,130 | 259.34 ₹26,452.68 | 233.4 ₹23,806.8 | 209.5 ₹21,369 | 235.22 ₹23,992.58 | 150 ₹15,300 Lowest | 180 ₹18,360 | 254 ₹25,908 | 230 ₹23,460 | 228 ₹23,256 |
| 5.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 185 | Cu.m | 95 ₹17,575 | 290 ₹53,650 | 111.09 ₹20,551.65 | 99.9 ₹18,481.5 | 90 ₹16,650 Lowest | 100.76 ₹18,640.35 | 100 ₹18,500 | 180 ₹33,300 | 212.7 ₹39,349.5 | 110 ₹20,350 | 97.5 ₹18,037.5 |
| 6.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 23 | Cu.m | 1,350 ₹31,050 | 1,850 ₹42,550 | 1,821.06 ₹41,884.38 | 1,547.9 ₹35,601.7 | 1,471.5 ₹33,844.5 | 1,651.7 ₹37,989.13 | 1,400 ₹32,200 | 1,500 ₹34,500 | 251.69 ₹5,788.87 Lowest | 1,800 ₹41,400 | 1,600 ₹36,800 |
| 7.00 | Supply and filling in foundation and basement with Stone dust in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 20 | Cu.m | 430 ₹8,600 | 1,650 ₹33,000 | 502.88 ₹10,057.6 | 452.59 ₹9,051.8 | 406.5 ₹8,130 | 456.11 ₹9,122.24 | 1,200 ₹24,000 | 1,600 ₹32,000 | 246.73 ₹4,934.6 Lowest | 1,000 ₹20,000 | 442 ₹8,840 |
| 8.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 29 | Cu.m | 130 ₹3,770 | 210 ₹6,090 | 157.79 ₹4,575.91 | 142.01 ₹4,118.29 | 127.5 ₹3,697.5 | 143.12 ₹4,150.35 | 40 ₹1,160 Lowest | 100 ₹2,900 | 1,156.37 ₹33,534.73 | 130 ₹3,770 | 138.5 ₹4,016.5 |
| 9.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. | 20 | Cu.m | 5,100 ₹1,02,000 | 4,850 ₹97,000 | 5,270.63 ₹1,05,412.6 | 4,743.56 ₹94,871.2 | 4,258.5 ₹85,170 | 4,780.46 ₹95,609.23 | 5,000 ₹1,00,000 | 5,200 ₹1,04,000 | 3,500 ₹70,000 Lowest | 5,200 ₹1,04,000 | 4,630 ₹92,600 |
| 10.00Brick work in Cement Mortar 1:3, (One Cement and Three M-Sand) using best quality II class ground moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||||||||||
Tender Value
₹2.1 Cr
EMD Value
₹1.2 L
Closing Date
16 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer PWD Buildings Construction
Office of the Superintending Engineer PWD Buildings Construction and Maintenance Circle 2, Chepauk Chennai 5
Construction of Specialized Ophthalmic Unit in First floor over the existing Ground floor of Eye Block in Government Medical College Hospital at Chengalpattu District
2026_PWD_719497_1
08-02 BCM/2026-27
Open Tender
Civil Works
Lump-sum
Chengalpattu
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.2 L
16 Nov 2026
30 Oct 2026
16 Nov 2026
30 Oct 2026
16 Nov 2026
30 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away and carefully stacking materials use ful for re-use for any thickness of Pressed tiles and weathering course etc.complete and as directed by the departmental officers. | 307 | Sqm | - | - |
| 2 | Dismantling, clearing away and carefully stacking the materials useful for reuse of Brick / stone masonry in Cement mortar walls, add for every additional 3m or part there of over the initial height of 3m etc. complete complying with standard specfication and as directed by the departmental officers. | 17 | Cum | - | - |
| 3 | Dismantling, clearing away and carefully stacking the materials useful for reuse of RCC works etc. complete complying with standard specfication and as directed by the departmental officers. | 6 | Cum | - | - |
| 4 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 102 | Cu.m | - | - |
| 5 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct-ed by the departmental officers. | 185 | Cu.m | - | - |
| 6 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 23 | Cu.m | - | - |
| 7 | Supply and filling in foundation and basement with Stone dust in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 20 | Cu.m | - | - |
| 8 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 29 | Cu.m | - | - |
| 9 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. | 20 | Cu.m | - | - |
| 10Brick work in Cement Mortar 1:3, (One Cement and Three M-Sand) using best quality II class ground moulded chamber burnt bricks of size 9" x 4-3/8" x 2-3/4" conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_864059.xls
BOQ • 0.41 MB
CONDITIONEye.pdf
Tender Documents • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .