Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.7 L+₹717.20 (0.15%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.9 L+₹13,105.18 (2.77%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹5.0 L+₹26,145.15 (5.53%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹5.3 L+₹57,962.70 (12.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹6.5 L
EMD Value
₹13,040
Closing Date
17 Aug 2026, 4:00 pmClosed
Executive Engineer RnB DIVISION SUMBAL
Sumbal Sonawari
Construction of road at Gundi Iqbal from Irrigation Canal to Land of Syed Sajad
2026_PWDJK_320459_1
NIT NO 44 OF 2026-27/SUMBAL DIVISION
Open Tender
Civil Works
Percentage
20 days
Sumbal Sonawari
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer RnB DIVISION SUMBAL
₹13,040
18 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
17 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and spreading of Nalla muck /khak bajree/quarry muck incl spreading ,watering ,consuladtion with road roller with 8 to 10 capacity incl binding material and all carriage involved | 247.5 | cum | 1,200 | ₹2,97,000 |
| 2 | Supply and spreading of grade ist (90 mm to 45 mm) incl spreading ,watering ,consuladtion with road roller with 8 to 10 capacity incl binding material and all carriage invol | 82.5 | cum | 1,600 | ₹1,32,000 |
| 3 | Earth work in excavation for foundation in trenches including dressing of sides, ramming of bottom & disposal of excavated soil up to an avg. lead of 50 Mtrs & lift up to 1.5 Mtrs | 6.89 | cum | 256.85 | ₹1,769.7 |
| 4 | Providing and laying of dry stone soling, tightly hand packed and incl. all carriages involved | 1.15 | cum | 1,000 | ₹1,150 |
| 5 | Providing and laying in position plain cement concrete 1:4:8 mix ratio M7.5 using 40 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level)incl all carriage | 0.57 | cum | 5,202.9 | ₹2,965.65 |
| 6 | Providing and laying in position cement concrete 1:2:4 mix ratio M15 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | 8.11 | cum | 6,591.25 | ₹53,455.04 |
| 7 | Providing and laying in position reinforced cement concrete 1:1.5:3 mix ratio M20 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | 6.97 | cum | 9,821.85 | ₹68,458.29 |
| 8 | FormWork/ Shuttering i/c propping, centering and removal. Complete job:foundation abutments | 19.11 | Sqm | 286.35 | ₹5,472.15 |
| 9 | Suspended floor | 8.5 | Sqm | 718.2 | ₹6,104.7 |
| 10 | Reinforcement for RCC work incl cutting bending ,binding placing in position complete job. | 6.27 | qtl | 12,320 | ₹77,246.4 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1065494.xls
BOQ • 0.43 MB
nomenclature.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .