Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 LAccepted-AOC OPP MINI ZOO HADDO SOUTH ANDAMAN 744 102 | SOUTH ANDAMAN | ANDAMAN AND NICOBAR ISLANDS | 744102 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹17.6 L+₹21,390 (1.23%)Rejected-AOC 1 TROPICAL REFRIGERATION PHONIX BAY PORT BLAIR PORT BLAIR ANDAMAN NICOBAR 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | L2 | Rejected-AOC Being not L1 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
21 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Col Rajinder Singh, CWE
Commander Works Engineer Military Engineer Services Minniebay Junglighat Post Port Blair 744103
80974 Repairs Maint AC Plants central AC plants and package type AC plants at INS Utkrosh NTS Teylerabad and NAD Dollygun of AGE EM-II Under GE Minniebay Port Blair
2022_MES_509420_1
80974 Rep Maint AC Plats under GE Minniebay
Open Tender
Civil Works - Others
Item Rate
270 days
GE Minniebay Port Blair
Class E Category c i
8 documents required · 8 mandatory
₹500
GE Minniebay
₹40,000
Yes
7 Apr 2022
21 Feb 2022
28 Mar 2022
21 Feb 2022
21 Mar 2022
7 Mar 2022
60 days
Amount
Overhauling of compressor 22.5 TR complete including taking down unserviceable parts and refixing new parts whererever necessary complete all as directed by Engr-in-Charge after pumping down the complete system and collecting the refrigerant into container, compressor oil into clean container, disconnecting the compressor from suction & discharge side and including leak testing of compressor after reassembling the parts, recharging/filling retrived oil & gas, replacement of belt if required and testing upto satisfactory cooling performance complete all as specified and as directed. Make: Bock compressor.( Utkrosh) Note: (i) spare parts , refrigerant (gas) & compressor oil for top up if required shall be measured and paid for seperately as supply only in respective item of this schedule. (ii) Metal filling , grinding, polishing spring, washer, quarter, and consumable items such as grease cotton waste etc., are deemed to be included in the quoted rate. (iii) Belt shall be paid seperately as supply only.
Overhauling of compressor 36TR complete including taking down unserviceable parts and refixing new parts whererever necessary complete all as directed by Engr-in-Charge after the pumping down the complete system and collecting the refrigerant into condener, compressor oil into clean container, disconnecting the compressor from suction & discharge side and including leak testing of compressor after reassembling the parts, recharging/filling retrived oil & gas, replacement of belt if required and testing upto satisfactory cooling performance complete all as specified and as directed. Make: Bock compressor.(NTS Teylerabad) Note: (i) spare parts , refrigerant (gas) & compressor oil for top up if required shall be measured and paid for seperately as supply only in respective item of this schedule. (ii) Metal filling , grinding, polishing spring, washer, quarter, and consumable items such as grease cotton waste etc., are deemed to be included in the quoted rate. (iii) Belt shall be paid seperately as supply only.
M&L for repair to suction & discharge valve of compressor 22.5 TR / 36 TR of capacity by means of replacing the teflon washer sheet, suction & discharge valve ring, spring, 'O' rings, gaskets etc complete and testing for proper holding of valve, leak testing etc all as specified and as directed. make: ACCEL.compressor.& BOCK compressor. NOTE: The rate inclusive of suction & discharge valve which is consider as one job.
M & L for descaling the shell & tube condenser of 22.5/ 36 TR capacity at by circulating the descaling chemical (scale gun) (HCL acid) through condenser by pressure feeding method after disconnecting condenser water lines, and opening the end covers of both side, brushing condenser water tubing, removing the scales, normalising the copper surface circulation normalising agent and refixing all dismantled parts including replacement of gasket set all as specified .
M & L for leak testing of AHU unit cooling coil after pumping down the complete system, isolating the cooling coil from both ends and charging the dry nitrogen gas for pressure leak test, after detecting leak point, release the nitrogen gas, repairing the leak point but means of soldering/brazing and connecting the cooling coil with system, vaccumised the complete system and re-charge the system by refrigerant, testing and commissioning up to satisfactory cooling performance of 45/72TR capacity. Note: (i) refrigerant gas shall be mesaured and paid separately as supply only. (ii) Nitrogen gas required deemed to be inclusive in the quoted rate.
M & L for leak testing of AHU unit cooling coil after pumping down the complete system, isolating the cooling coil from both ends and charging the dry nitrogen gas for pressure leak test, after detecting leak point, release the nitrogen gas, repairing the leak point but means of soldering/brazing and connecting the cooling coil with system, vaccumised the complete system and re-charge the system by refrigerant, testing and commissioning up to satisfactory cooling performance of 16 TR capacity. (INS Utkrosh) Note: (i) Refrigerant gas shall be mesaured and paid separately as supply only. (ii) Nitrogen gas required deemed to be inclusive in the quoted rate.
M & L for leak testing of AHU unit cooling coil after pumping down the complete system, isolating the cooling coil from both ends and charging the dry nitrogen gas for pressure leak test, after detecting leak point, release the nitrogen gas, repairing the leak point but means of soldering/brazing and connecting the cooling coil with system, vaccumised the complete system and re-charge the system by refrigerant, testing and commissioning up to satisfactory cooling performance of 10 TR capacity. (INS Utkrosh) Note: (i) Refrigerant gas shall be mesaured and paid separately as supply only. (ii) Nitrogen gas required deemed to be inclusive in the quoted rate.
M&L for Cleaning / servicing the cooling coil of AHU AC plant by pressure air method with using air blower and cleaning the cooling coil with cleaning the solution, cleaning the AHU base tray completely and applying one coat of synthetic enamelled paint inside the base tray, including greasing to AHU blower shaft bearing for smooth functioning, cleaning the AHU filter of 45 / 72 TR plant capacity complete all as specified and as directed.
S & F in Replacement of panel air filters, dry type, washable, rated air flow capacity 1600 CFM 99.9%, down to particle 20 micron of Suitable sizes or nearest for AHU of central AC plant (22.5/36 Tr)
M&L for pumping down the gas of the Package type AC plant of various capacities pressure testing the complete plant by dry nitrogen gas by separating high side and low side, rectifying the leakage by gas welding brazing pressure testing vaccuming the system and re-charging the system with gas, testing and commissioning complete.(INS Utkrosh 16Tr,10Tr, & NAD 8.5Tr) Note:- (i) Nitrogen gas required are deemed to include in the quoted rate. (ii) refrigerant gas shall be mesaured and paid separately as supply only.
Cleaning / servicing the cooling coil of AHU AC plant by pressure air method with using air blower and cleaning the cooling coil with cleaning the solution, cleaning the AHU base tray completely and applying one coat of synthetic enamelled paint inside the base tray, including greasing to AHU blower shaft bearing for smooth functioning, cleaning the AHU filter replacement of V-belt (if required) of 16 TR plant capacity at INS Utkrosh & NAD Dollygunj all as specified .
Supply & Fixing compressor in replacement for up to 8.5 TR capacity packge type AC plant including mounting brackets , clamps nut bolts and necessary electrical connections all as specified and directed
Cleaning / servicing the cooling coil of AHU AC plant by pressure air method with using air blower and cleaning the cooling coil with cleaning the solution, cleaning the AHU base tray completely and applying one coat of synthetic enamelled paint inside the base tray, including greasing to AHU blower shaft bearing for smooth functioning, cleaning the AHU filter of 10 TR plant capacity at INS Utkrosh & all as specified .
M&L for pumping down the gas of the Central AC plant of various capacities pressure testing the complete plant by dry nitrogen gas by separating high side and low side, rectifying the leakage by gas welding brazing pressure testing vaccuming the system , testing and commissioning complete.(INS Utkrosh 22.5Tr & NTS Teylerabad 36 Tr )
Cleaning/servicing of cooling tower, natural draught type of central AC plant including cleaning of wooden louvers by scraping inside and outside, cleaning of water tank, cleaning of nozzles (brass/PVC) , arranging all wooden louvers in correct manners, and applying one coat of bituminous paint inside and outside of water tank complete of capacity 45 / 72 TR complete all as specified and as directed.
supply and fixing of PVC spray nozzles 20 mm size for cooling tower as per sample.
supply and fixing of PVC spray nozzles 25 mm size for cooling tower as per sample.
Preparation of old painted surfaces and applying two coats of synthetic enamelled paint to external surfaces to compressor with motors - 03 No's, foundation of compressor & motor units- 03 No's, suction & discharge refrigerant pipe line, condenser water pump with motor & foundation - 02 No's, water pipe line, AHU unit and motor/blower- 01 No, condenser - 03 No's of any capacity of central AC plant. (INS Utkrosh / NTS Teylerabad)
M & L for dismantling burnt out three phase, 50 C/S capacity 20/25 HP motor for rewinding with same guage, weight and same number of turns of super annealed copper wire including paper/tape of approved quality and varnishing with Class I varnishing compound including heating and re-assembling the motor, testing and commissioning after repair complete all as specified.
All as per item above but motor capacity 12.5 HP.
All as per item above but motor capacity 10 HP.
All as per item above but motor capacity 7.5 HP.
All as per item above but motor capacity 5 HP.
S & F in replacement of `V' belt size B-78.
S & F in replacement of `V' belt size A-32.
M&L for dismantling Monoblock pump set up to 10 HP removing scales cleaning, heating varnishing of motor winding, servicing the pump sets by repalcing the worn out bushes, bearings, gland rope, gland bolts & nuts, painting Twocoat etc reassembling the complete pump set including testing and commissioning complete all as directed by Engineer - in - Charge.
S & F in replacement of pressure gauge of HP size 4" dia of rating 0 - 300 PSI all as specified .
S & F in replacement of water pressure gauge of 4 " dia of range 0 - 7 Kg /sqcm or 0 - 100 PSI all as specified
S & F replacement of pressure gauge of LP OP (low pressure /oil pressure) size 4" dia of rating -30 to 150 PSI all as specified
S & F in replacement of HP cut out Type MP - 5 suitable for R - 22 gas complete all as specified and as directed.
S & F in replacement of LP/HP combination cut out MP - 15 Suitable for R 22 gas complete with flare nut complete all as specified and as directed.
S & F in replacement of oil pressure control switch type MP - 55 suitable for R - 22 complete with flare nut complete all as specified and as directed.
S & F in replacement of solenoid pilot control valve type 10 with two / three coil assembly of same model all as specified. (INS Utkrosh & NTS Teylerbad, NAD Dollygunj)
Supply only synthetic refrigeration compressor oil suitable for 36TR compressor.
Supply only compressor oil N 68 sheetal suitable for ACCEL compressor of capacity 22.5 TR
S&F in replacement of thermostatic expansion valve of model MWE - 34 - CP 100 of Make - SPORLAN all as specified.(INS Utkrosh & NTS Teylerabd, NAD Dollygunj)
Supply only refrigeration gas R 22 in manufacturer sealed cylinder. NOTE:- (i) Gas to be supplied in manufacturer sealed container. (ii) Empty containers will be returned to contractor .
Replacement of 6/10 mfd condensor suitable for cooling fan motor of outdoor unit of package AC plant 5 TR capacity(INS Utkrosh )
Replacement of 20 mfd condensor suitable for cooling fan motor of outdoor unit of package AC plant 8.5 TR capacity
Replacement of 20 mfd condensor suitable for cooling fan motor of outdoor unit of package AC plant 10 TR capacity(INS Utkrosh)
S & F in replacement of condensor fan motor including blade1/5 HP single phase complete for 5 TR package AC plant .
S & F in replacement of condensor fan motor 1/5 HP single phase complete for 8.5 TR package AC plant .
S & F in replacement of condensor fan motor 3/4 HP single phase complete for 10 TR package AC plant .
S & F in replacement of condensor fan motor 3/4 HP single phase complete for 16 TR package AC plant .
S & f in replacement of micro computer control with PCB complete for package AC unit 5 to 16 TR.
Supply and fix bearing suitable for 25 HP three phase motor .
Supply and fix bearing suitable for 20 HP three phase motor .
Supply and fix bearing suitable for 10 HP three phase motor .
Supply and fix bearing suitable for 7.5 HP three phase motor
Supply and fix bearing suitable for 5 HP three phase motor
Supply and fix bearing suitable for 3 HP three phase motor
Supply and fix bearing suitable for 1 HP three phase motor
Supply and fix threaded flanged joints suitable for 80/100mm bore GI pipe.
Supply and fix sump heater assy Cat No. 8426 Make. Bock
Attending complaints of central/package AC of any capacity, replacement of spare parts and brings to normal working condition all as per directed and specified by Engr-in-charge.
Supply & fix replacement of power contactor MNX 45 Make: L&T or equivalent as approved by GE
Supply & fix replacement of power contactor MNX 25 Make: L&T or equivalent as approved by GE
Supply & fix replacement of power contactor MNX 18 Make: L&T or equivalent as approved by GE
Supply & fix of electronic type star delta starter fully automatic suitable for 10 HP water coolent motor. Make: L&T or equivalent as approved by GE all as specified & directed.(NTS Teylerabad)
S & F in replacement of over load relay suitable for 22.5 & 36 TR compressor motor starter all as specified & directed.
S & F in replacement of timer 22.5 & 36TR compressor motor starter all as specified & directed. Make : BCH
Replacement of drier core suitable for 36 TR Central AC plant,all as specified & directed.
Replacement of drier core suitable for 22.5 TR Central AC plant,all as specified & directed.
Replacement of drier core suitable for 16 TR Central AC plant,all as specified & directed.
Replacement of drier core suitable for 10 TR Central AC plant,all as specified & directed.
Replacement of drier core suitable for 5 TR Central AC plant,all as specified & directed.
Supply only Seegar ring standard size for compressor SMC 6-65 make ACCEL.
Supply onlySuction valve retaining plate for compressor SMC 6-65 make ACCEL.
Supply only discharge valve retaining plate for compressor SMC 6-65 make ACCEL.
Supply only Piston standard size for compressor SMC6-65 make ACCEL.
Supply only Oil regulating valve for compressor SMC 6-65 make ACCEL.
Supply only Bush for piston pin for compressor SMC 6-65 make ACCEL.
Supply only Piston pin for compressor SMC 6-65 make ACCEL.
Supply only Rocket arm spring for compressor SMC 6-65 make ACCEL.
Supply only oil pump assembly for compressor SMC 6-65 make ACCEL.
Supply only Unloading cylinder for compressor SMC 6-65 make ACCEL.
Supply only Crankshaft assembly for compressor SMC 6-65 make ACCEL.
Supply and Fixing Expansion valve for 5.5 TR condensor Make : Danforce
supply and fix PC Board assembly suitable for 16 TR package AC Make : Blue star
Supply and Fixing in replacement of Air cooled condensor out door type with tank and copper tube for discharge line unit assembly including contactor capacitor suitable for capacity 5.5 / 8.5 TR all as specified and directed Make: Blue star
S&F in replacement on load changeover switch 415 V, 4 pole, 400 Amps, with sheet steel enclosure all as specified and as directed to be matched with existing type/size & to be fixed in the existing panel .[Make: L&T/ Schneider/ Siemens/ Legrand/ Havells]
M & L for discannecting , removing of 3 HP motor form package type AC carry out to workshop for repairing/ , brushing . Cleanig and replaced necessaary required items , rixing in the same position with out damge all as specified and directed
Supply& fixing shaft seal assy for 22.5/36 tr including connected accessories etc. ACCEL/BOCK complete all as specified and directed.
Supply and fix in replacement of old unserviceable GI Sheet with TDF flange rectangular/square duct made out of 'L' shaped hollow profile,duly factory boxed ,incl all accessories such as supply air and return air diffuser,corner, cleat,carrage bolt,gasket and appropriate sealent on longitudinal joints etc complete of size 18 Gauge complete all as specified and directed.
Tropical Refrigeration
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .