Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
13 Jun 2025, 3:00 pmClosed
Block Developement Officer BP
Block Developement Office Thiruporur
Construction of SS Fabrication Bus Shelter in Thiruporur road at Perunthandalam Panchayat Thiruporur Panchayat Union in Chengalpattu District for the Year 2025- 2026 having Package No . 5/2025 - 2026
2025_RDTN_564394_1
R.C. No 0986/2025/A3 Dt 23.05.2025
Open Tender
Civil Works - Buildings
Item Rate
Perunthandalam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
Yes
Block Developement Office Thiruporur
13 Jun 2025
3 Jun 2025
13 Jun 2025
3 Jun 2025
13 Jun 2025
3 Jun 2025
5 Jun 2025
Amount
Construction of SS fabrication bus shelter at in Thiruporur road at Perunthandalam Panchayat at Thiruporur Panchayat Union in Chengalpattu District for the Year 2025-26 having Package No .5/2025-26 scheme of MLACDS
Earth work excavation for foundation in all soils and sub soils to full depth etc
Filling with Msand including cost and Conveyance of all charges etc.
Refilling with excavated earth including cost and conveyance of all labour charges
CC 1:4:8 mix using 40mm ISS HBG Metal including all cost and conveyance etc.complete.
RCC 1:1.5:3 mix using (One cement two sand and four hard bronken granite stone) using 20mm gauge hard broken granite stone jelly for foundation including cost and conveyance of all materials to site and all labour charges at site including curing etc comp
Supplying and centering of sides and sofits includign supports and strutting upto base
Supplying and fabrication of steel including cost and conveyance of all labour charges '
Brick work in cm 1:5 for super structure usign stock brick including all cost and labour charges etc.complete . Complying with standard specification etc.
Plastering with cm 1:5 mix using 10mm thick including all charges
Paving the floor with vertified tiles including all labour charges
Supply and delivery , fabrication and installation of the fram work for the bus shelter in SS section of SS sch 10s including all labour charges
Supply and delivery fabrication and erection of the roof using sheet 0.5mm welding the roof with the frame fixing solar panel and name board Roofing sheet JSW 0.5mm
Roofing sheet JSW 0.5mm
labour cost for roofing and welding
Solar panel and boattery light
Name boards
Provsion for Chair
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Shobana S (BID ID -1365909)
stage.html
html • 0.02 MB
finance_673800.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .