RequiredExperience with Government
RequiredAnnual Turnover
RequiredCertificate (Requested in ATC)
RequiredOEM Authorization Certificate
RequiredOEM Annual Turnover Bid to RA enabled No Note: 1. OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years
Requiredending on 31st March of the previous financial year
Requiredshould be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant/Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution/incorporation of the OEM is less than 3 year old
Requiredthe average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. Designing Software ( 30 pieces ) ( Under PAC ) Make coreldraw Model coreldrawgraphicsuite2019educationlicense(with 1/5 02yearupgrade) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) BASIC INFORMATION OF DESIGNING SOFTWARE(GOLDEN) Software Domain Type Architectural
Requiredmechanic al
RequiredPerpetual
RequiredSubscriptio n Architectural
Requiredmechanical
RequiredPerpetual
RequiredSubscription Name of Software CorelDRAW GS2019Educ * Name of the OEM Corel Corporation * OEM Model/Part No/Product Id of OEM Corel Corporation * Software Version/Version Name CorelDRAW GS2019Educ * Date of Launch of Version April2019 * FEATURES AND FUNCTIONALITY PARAMETERS(GOLDEN) Advance surfacing No No Composite Material Design No No Conceptual design Yes Yes Direct Modeling No No Electrical cable and Conduit design No No Mesh CAD Models No No Mold design No No Parametric Modeling No No Plastic Parts Design No No Weldments Yes Yes 2D System Analysis No No Circuit Simulation No No Fluid Flow Simulation No No Human Simulation No No Motion Simulation No No Stress Analysis No No Structural Validation No No Sustainability Analysis No No 2/5 If yes
RequiredOther Simulation/Analysis Features NA * Photorealistic Images Yes Yes Walk-Through Animation No No If yes
RequiredOther Animation Rendering Features NA * Compare Costs No No Output Cost Report No No Automatic Cost Estimation No No No. of days Training Provided at Site 0 0 Number of Years upto which Support is available from OEM/Franchise online (Years) 2 2
Required3
Required5
Required10 Or higher FEATURES AND FUNCTIONALITY PARAMETERS(GENERIC) 2D Drawing Yes * 3D Modeling No * Fastening Systems No * Large Assembly Design No * Piping Tubing Design No * Sheet Metal Design No * Collision and Interference Check No * Assembly Animation No * Rendering No * Bill of Materials No * If yes
RequiredOther Cost Estimation Features NA * Annotations Yes * Dimensions No * Tolerance No * Wireframes No * Other Documentation Features NA * SUPPORTED HARDWARE REQUIREMENT PARAMETERS Hard Disk Space Required 500 GB * RAM Size required 4GB or Higher * 3/5 CPU required Core i5 * Operating Systems supported (Driver) Windows * Supported Devices 01 * Supported Database NA * GENERIC PARAMETERS OF DESIGNING SOFTWARE Free Upgradation to Higher Version YES * Maximum user handling capability 01 * Concurrent user handling capability 01 * Valid Licence copy to be provided YES * Mode of License to be delivered Electronic * Software supplied through URL Link * Installation and Demonstration Yes * List of items included in the package Lic&Remoteinstall * Hyper link to Data sheet NA * No of Softwares sold 10000 * Number of User Referance no. 1 with in Government Department email
Requiredphone no.Of concerned authority where Software/Appliance installed 1 * Details of Government Department email
Requiredphone no.Of concerned authority where Software/Appliance installed for above. Govt ITI
RequiredKannauj * * Specifications highlighted in bold are the Golden Parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer. Additional Specification Documents