| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-Finance CHAKMADA HANDIA PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹13.8 L | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among two. |
| 2 | L2₹13.9 LRejected-Finance | ₹13.9 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | BALAJI CONSTRUCTIONS L1 | M/S IRFAN TRADERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer in-charge up to distance of 30 M from the foundation trenches | 662.82 | cum | 122 ₹80,864.41 | 129 ₹85,504.17 |
| 2.00 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | 24.73 | cum | 5,912 ₹1.5 L | 5,708 ₹1.4 L |
| 3.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 22.37 | cum | 6,725 ₹1.5 L | 6,400 ₹1.4 L |
| 4.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 4.61 | cum | 7,612 ₹35,121.77 | 7,200 ₹33,220.80 |
| 5.00 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | 23.18 | sqm | 468 ₹10,846.37 | 485 ₹11,240.36 |
| 6.00 | Ordinary Centering and Shuttering or steel shuttering for R.C.C. work including cost of all labour and T&P etc. complete. | 29.34 | sqm | 785 ₹23,035.04 | 800 ₹23,475.20 |
| 7.00 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 95.49 | cum | 5,036 ₹4.8 L | 5,200 ₹5.0 L |
| 8.00 | Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P all lifts and leads etc complete. | 58.28 | sqm | 114 ₹6,643.58 | 112 ₹6,527.02 |
| 9.00 | Providing 100 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | 4 | each | 690 ₹2,760 | 710 ₹2,840 |
| 10.00 | S/F 100 MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | 8 | each | 150 ₹1,200 | 153 ₹1,224 |
Tender Value
₹14.3 L
EMD Value
₹1.4 L
Closing Date
18 Apr 2026, 12:00 pmClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION 9 SAMBHAL
CONSTRUCTION OF V.R.B AT KM 0.550 OF ESCAPE
2026_UPIDC_1128922_2
01/EE/2025-26
Open Tender
Civil Works - Canal
90 days
SAMBHAL
PLEASE REFER TENDER DOCUMETS
3 documents required · 3 mandatory
₹766
₹1.4 L
Yes
SAMBHAL
5 May 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer in-charge up to distance of 30 M from the foundation trenches | - | cum | - | - |
| 2 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | - | cum | - | - |
| 3 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | - | cum | - | - |
| 4 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | - | cum | - | - |
| 5 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | - | sqm | - | - |
| 6 | Ordinary Centering and Shuttering or steel shuttering for R.C.C. work including cost of all labour and T&P etc. complete. | - | sqm | - | - |
| 7 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | - | cum | - | - |
| 8 | Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P all lifts and leads etc complete. | - | sqm | - | - |
| 9 | Providing 100 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | - | each | - | - |
| 10 | S/F 100 MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | - | each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.82 MB
BOQ_2120983.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid