Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC CHAKMADA HANDIA PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | L1 | Accepted-AOC BID FOUND IN ORDER AND ADMITTED FOR FINANCIAL EVALUATION | |
| 2 | L2₹13.9 L+₹11,098.64 (0.80%)Rejected-Finance | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | BALAJI CONSTRUCTIONS L1 | M/S IRFAN TRADERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer in-charge up to distance of 30 M from the foundation trenches | 662.82 | cum | 122 ₹80,864.41 Lowest | 129 ₹85,504.17 |
| 2.00 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | 24.73 | cum | 5,912 ₹1,46,191.94 | 5,708 ₹1,41,147.42 Lowest |
| 3.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 22.37 | cum | 6,725 ₹1,50,465.15 | 6,400 ₹1,43,193.6 Lowest |
| 4.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 4.61 | cum | 7,612 ₹35,121.77 | 7,200 ₹33,220.8 Lowest |
| 5.00 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | 23.18 | sqm | 468 ₹10,846.37 Lowest | 485 ₹11,240.36 |
| 6.00 | Ordinary Centering and Shuttering or steel shuttering for R.C.C. work including cost of all labour and T&P etc. complete. | 29.34 | sqm | 785 ₹23,035.04 Lowest | 800 ₹23,475.2 |
| 7.00 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 95.49 | cum | 5,036 ₹4,80,867.5 Lowest | 5,200 ₹4,96,527.2 |
| 8.00 | Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P all lifts and leads etc complete. | 58.28 | sqm | 114 ₹6,643.58 | 112 ₹6,527.02 Lowest |
| 9.00 | Providing 100 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | 4 | each | 690 ₹2,760 Lowest | 710 ₹2,840 |
| 10.00 | S/F 100 MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | 8 | each | 150 ₹1,200 Lowest | 153 ₹1,224 |
Tender Value
₹14.3 L
EMD Value
₹1.4 L
Closing Date
18 Apr 2026, 12:00 pmClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION 9 SAMBHAL
CONSTRUCTION OF V.R.B AT KM 0.550 OF ESCAPE
2026_UPIDC_1128922_2
01/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
90 days
SAMBHAL
PLEASE REFER TENDER DOCUMETS
3 documents required · 3 mandatory
₹766
₹1.4 L
Yes
SAMBHAL
10 Jun 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
18 Apr 2026
13 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer in-charge up to distance of 30 M from the foundation trenches | - | cum | - | - |
| 2 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | - | cum | - | - |
| 3 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | - | cum | - | - |
| 4 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | - | cum | - | - |
| 5 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | - | sqm | - | - |
| 6 | Ordinary Centering and Shuttering or steel shuttering for R.C.C. work including cost of all labour and T&P etc. complete. | - | sqm | - | - |
| 7 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | - | cum | - | - |
| 8 | Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P all lifts and leads etc complete. | - | sqm | - | - |
| 9 | Providing 100 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | - | each | - | - |
| 10 | S/F 100 MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.82 MB
BOQ_2120983.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .