| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.4 LAccepted-AOC NO 1 KHIRING KHIRING PO NAKHUTI PS LUMDING DIST HOJAI ASSAM | ₹43.4 L Quoted ₹13.7 Cr | L1 | Accepted-AOC Awarded |
| 2 | L1₹48.4 LAccepted-AOC VILL DAKHINUDALI P O LACHITPATHAR P S LANKA DIST HOJAI NAGAON | ₹48.4 L Quoted ₹13.7 Cr | L1 | Accepted-AOC Awarded |
| 3 | L2₹43.4 L−₹12.3 Cr (90.0%)Accepted-AOC 46 IRRIGATION CANAL ROAD RAJAPUKHURI P O JUGLJAN P S HAJAL ASSAM | ₹43.4 L−₹12.3 Cr (90.0%) Quoted ₹1.4 Cr | L2 | Accepted-AOC Awarded |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
20 Dec 2024, 2:00 pmClosed
Chief Engineer Minor Irrigation
O/o the CEMI Assam Chandmari Guwahati-3
Bardalang Lankajan LIS at Sonapur Samaguri under AIBP for the year 2013_14 under Jamunamukh-Hojai-Lumding Division I Hojai
2024_ID_40699_1
03 _AIBP 2024-25 Dated_ 28_11_2024
Open Tender
Civil Works
Item Rate
180 days
Hojai
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,900
₹2.7 L
Yes
O/o the CE I Assam Chandmari
2 Feb 2025
29 Nov 2024
20 Dec 2024
29 Nov 2024
20 Dec 2024
29 Nov 2024
9 Dec 2024
Amount
Construction of Brick Lined Canal (B-1) from Chainage 0m to 417.3 m and (B-2) from Chainage 0m to 417.3 m
Item no. 1: Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).(A) In all types of soils (except soil mixed with gravel and boulders) i For normal lead of 30m and lift of 1.50m
Item no. 2: Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
Item no. 3: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 4: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 25 mm including curing,bailing out water with timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 5: 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Item No. 6 :Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No. 7: RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including curing etc, complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 8: Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) (i) with 19mm thick plyboard
Item No. 9/6 :River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Item No. 10: 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Item No.11: Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2 ), joining pipes with relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately) i) 110m dia pipes(at 15m interval both side)
Construction of Canal Cross Regulator Gate
item no. 1: Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified.
item no. 2: River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
item no. 3: CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 4: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 25 mm including curing,dewatering with timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 5: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 6: Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered ,shuttering coloum
Item No. 7: 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No. 8: Fabrication supply and installation of manually operated steel gate with frame 150x150x75x40mm MS channel side to be filled with MS plate of 6mm thick stiffeners of size 50x50x10mm angle 40x5mm thick MS plate for lock foot plate and 30mm thick ms plate for base plate including necessary best quality rubber seal and pulling system tool box device position for all duly welded including fabrications with MS round 65mm dia for sliding device with two coats of red oxide etc complete as directed
Item No. 10: Rubber seal
Item No. 11: Screw shaft
Item No. 12: Painting with red oxide(one coat)
Construction of RCC slab culvert
item no. 1: Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified.
Item no. 2: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 25 mm including curing,dewatering with timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
item no. 3: 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Item no. 4: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed. A)16mm dia @ 100c/c HYSD Bar at both ways
Item No. 5: Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered ,shuttering coloum (A) Shuttering (Slab).
Item No. 6: RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc, complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 7: 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No. 8: Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
Construction of 0.60m dia 5.0m long cross drainage
item no. 1: Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified.
Item no. 2: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 25 mm including curing,dewatering with timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
item no.3: Supply of Hume pipe of 0.60m dia NP2(excuding GSt)
Item no. 4: Supply of collar(excluding GST)
Item No.5: Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site (i) For 30 cm to 60 cm dia
Item No. 6: Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered ,shuttering coloum (A) Shuttering (Slab).
Item No. 7: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 25 mm including curing,dewatering with timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 8: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Item No. 9: 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Construction of Brick Lined Canal (B-1/1) from Chainage 0m to 110m
item no. 1:Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).(A) In all types of soils (except soil mixed with gravel and boulders) i For normal lead of 30m and lift of 1.50m
item no. 2: Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
item no. 3: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item no. 4: CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 25 including curing,bailing out water with timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 5: 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. (i) in proportion 1:4
Item No. 6: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No. 7: RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including curing etc, complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 8: Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) (i) with 19mm thick plyboard
Item No. 9: River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Item No. 10: 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Item No.11: Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2 ), joining pipes with relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately) i) 110m dia pipes(at 10m interval)
M/s S.I. Enterprise (BID ID -251049)
M.S. Enterprise (BID ID -251916)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .