Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-Finance | ₹18.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹18.6 L+₹7,329.44 (0.40%)Rejected-Finance | ₹18.6 L+₹7,329.44 (0.40%) | L2 | Rejected-Finance L2 |
| 3 | L3₹19.7 L+₹1.2 L (6.24%)Rejected-Finance | ₹19.7 L+₹1.2 L (6.24%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹50,548
Closing Date
14 May 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward 21 Mohnapur me ram ugarah ke makan se prbhavti devi ke makan tak cc sadak aur bai taraf rccc nali ka nirman
2026_DOLBU_1145725_1
Ward 21 NNG
Open Tender
Civil Works
Percentage
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
Nagar Nigam Gorakhpur
₹50,548
8 Sept 2026
6 May 2026
15 May 2026
6 May 2026
14 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Earth work in filling with cartage upto 10Km diastance at site including dracsing and leveling etc all complete . | 565.95 | Cum | 330.1 | ₹1,86,820.1 |
| 1.02 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete . | 79.38 | Cum | 120 | ₹9,525.6 |
| 1.03 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 1 | Cum | 4,007 | ₹4,002.99 |
| 1.04 | M 150 class brick work in 1:4 with cement &approved Course Sand mortar including supply all material and S.I.N. labor etc. | - | Cum | 5,817 | - |
| 1.05 | Laying C.C in 1:2:4 for top of drain work. with cement, Course Sand20 mm & Stone Grit including supply of all material and labour etc. | 1 | Cum | 8,186 | ₹8,177.81 |
| 1.06 | Laying Flat solling etc. | 558.6 | Sqm | 336 | ₹1,87,689.6 |
| 1.07 | P/fixing of Road Barricating including etc. all complete of work. | 16 | Rmt | 118 | ₹1,888 |
| 1.08 | S/Laying of GSB 53.-9.5 mm thick S/B upto 10Cm loose Layer including etc. all complete of work. | 55.86 | Cum | 3,134.25 | ₹1,75,079.21 |
| 1.09 | Consolidation of GSB upto 10 cm thick loose layer by Road Roller including etc. all.complete. | - | Cum | 295 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.96 MB
t.pdf
Tender Documents • 2.94 MB
BOQ_2142057.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .