Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.4 LAccepted-AOC 01 ENTERPRISES | L1 | Accepted-AOC accepted being L1 | |
| 2 | L2₹34.9 L+₹2.9 L (9.22%)Rejected-Finance | L2 | Rejected-Finance rejected being L2 | |
| 3 | L3₹36.6 L+₹4.6 L (14.5%)Rejected-Finance | L3 | Rejected-Finance rejected being L3 | |
| 4 | L4₹37.0 L+₹5.1 L (15.9%)Rejected-Finance | L4 | Rejected-Finance rejected being L4 | |
| 5 | L5₹38.7 L+₹6.7 L (21.1%)Rejected-Finance | L5 | Rejected-Finance rejected being L5 |
| Sl No | Description | Qty | Unit | Singla Enterprises L1 | ABHINANDAN ENTERPRISES L4 | AABIA CONSTRUCTION L2 | Batra Builders L3 | RAMA AUTOS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Comprehensive maintenance for Carpentry work by attending day to day complaints of joinery related such as replacement of Builders hardware of doors, windows & cupboard and other Carpentry nature works like easing/re-securing & adjusting, without taking down shutter of door, windows and cupboards. Tightening of screws for tower bolt/Aldrop bolt/ stoppers, handle hinges in respect to Easing of door / windows/cupboards (Steel Wooden/Aluminium) of any description and size by cleaning, adjusting in position and making the same functional incl fittings (if reqd) with and incl greasing, oiling, screws/nales for fixing the fittings complete all as specified and directed. | 200 | Each | 200 ₹40,000 | 216.6 ₹43,320 | 100 ₹20,000 Lowest | 200 ₹40,000 | 200 ₹40,000 |
| 2.00 | Comprehensive maintenance to plumbing work by attending day to day complaints of plumbing nature like leaking bib taps, stop cock of any pattern or of any type including minor repairs to flush cistern, repair to PE-AL-PE composite pressure pipe/GI pipe leakages, removing air blockages if any and refixing old serviceable bib cocks, stop cocks any pattern after minor repairs such as replacement of washers, jumpers and spindle etc complete all as specified and directed. (any items like thread , Teflon tape, rubber washer, syphon kit, jumpers, brass spindles, caps etc shall be deemed to be included in the quoted rates).
Note for item No 64 to 66. The scope of work is of day to day maintenance nature/ requirement of works. Contractor shall attend the office of AGE B/R-I on daily basis and receive/ collect the complaints/ requirements of works and shall rectify the repair/maintenance works within time given below :-
(a) Minor plumbing complaints - 48 hours
(b) Minor Joinery complaints - 48 hours
(c) Minor masonry complaints - 48 hours
(d) Major Plumbing - 5 days
(e) Major Joinery - 15 Days.
If contractor fails to rectify the complaints with materials/ items to be replaced if required a penalty @ 50% of quoted rate by the contractors of that particular item shall be recovered from his payment. The responsibility of getting the complaints attended & rectified shall lies with the contractor even if he fails to complete the complaints within 48 hours. In the delayed case of a rectification of complaints even after 48 hours, he shall rectify the same within one week. (Note :- The complaint received from complaint cell shall have to be attended on same day). | 350 | Each | 200 ₹70,000 | 216.6 ₹75,810 | 100 ₹35,000 Lowest | 200 ₹70,000 | 200 ₹70,000 |
| 3.00 | Demolition of brick work or stone / boulder masonry, built in cement mortar including all quoins, arches, pillars etc., complete all as specified and directed. | 10.3 | Cum | 200 ₹2,060 | 216.6 ₹2,230.98 | 100 ₹1,030 Lowest | 200 ₹2,060 | 600 ₹6,180 |
| 4.00 | M&L brick work in cement mortar 1:6 with sub class `B' old size bricks straight or curved on plan exceeding 6.0m mean radius built complete all as specified and directed. | 8 | Cum | 4,000 ₹32,000 Lowest | 4,873.5 ₹38,988 | 4,250 ₹34,000 | 4,900 ₹39,200 | 4,500 ₹36,000 |
| 5.00 | M&L half brick work in cement mortar (1:4) with sub class 'B' bricks, straight or curved on plan to any radius etc; complete all as specified and directed. | 20 | Sqm | 500 ₹10,000 | 541.5 ₹10,830 | 350 ₹7,000 Lowest | 600 ₹12,000 | 600 ₹12,000 |
| 6.00 | Taking down cement or cement lime plaster of any description from brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed . | 1,150 | Sqm | 10 ₹11,500 Lowest | 21.66 ₹24,909 | 15 ₹17,250 | 20 ₹23,000 | 65 ₹74,750 |
| 7.00 | Material and labour for 15mm thick rendering in CM (1:4) on fair faces of brick work or concrete surfaces and finishing even & smooth but without using extra cement and applying wall care putty (1.5mm thick) in two layers on wall surface and smoothening the surface with sand papers / Mechanised sanding etc preparatory to paint and applying two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm complete all as specified and directed. | 600 | Sqm | 200 ₹1,20,000 Lowest | 433.2 ₹2,59,920 | 320 ₹1,92,000 | 320 ₹1,92,000 | 300 ₹1,80,000 |
| 8.00 | Material and labour for 15mm thick rendering in CM (1:6) on other than fair faces of brick work or concrete surfaces and finishing even & fair but without using extra cement and applying wall care putty (1.5mm thick) in two layers on wall surface and smoothening the surface with sand papers / Mechanised sanding etc preparatory to paint and two coat of acrylic emulsion distemper of approved tint over a coat of primer prepared surface by using Airless spray/Roller complete all as specified and directed. | 350 | Sqm | 200 ₹70,000 Lowest | 433.2 ₹1,51,620 | 305 ₹1,06,750 | 300 ₹1,05,000 | 300 ₹1,05,000 |
| 9.00 | Material and labour for rendering 5 mm thick in cement mortar in (1:3) on ceiling and finishing the surface even & fair without using extra cement and applying three coats of white wash on newly plastered surfaces complete all as specified and directed. | 200 | Sqm | 150 ₹30,000 Lowest | 433.2 ₹86,640 | 240 ₹48,000 | 300 ₹60,000 | 200 ₹40,000 |
| 10.00 | Taking down chowkats or frame with shutter (without taking out shutter from the frame) not exceeding 1.50 sqm each as doors, windows & ventilators etc. and removal from site all as specified and directed | 60 | Each | 100 ₹6,000 | 108.3 ₹6,498 | 40 ₹2,400 Lowest | 90 ₹5,400 | 200 ₹12,000 |
Tender Value
₹49.6 L
EMD Value
₹99,200
Closing Date
18 Jul 2026, 6:00 pmClosed
Major Mrugank Gargate GE(S) Bathinda
GE(S) Bathinda Bathinda Mil Stn
GE(S)BTD 34 OF 2026-27 REPAIR REPLACEMENT OF CERTAIN BR ITEMS IN OTM ACCN OF SECTOR III AND SECTOR V UNDER AGE BR I OF GE(S) BATHINDA AT BATHINDA MIL STN
2026_MES_773661_1
GE(S)BTD- 34 of 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE(S) Bathinda
Class D
category a(i)
11 documents required · 11 mandatory
₹500
GE(S)Bathinda
₹99,200
Yes
GE(S)Bathinda
3 Aug 2026
20 Jun 2026
20 Jul 2026
20 Jun 2026
18 Jul 2026
4 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive maintenance for Carpentry work by attending day to day complaints of joinery related such as replacement of Builders hardware of doors, windows & cupboard and other Carpentry nature works like easing/re-securing & adjusting, without taking down shutter of door, windows and cupboards. Tightening of screws for tower bolt/Aldrop bolt/ stoppers, handle hinges in respect to Easing of door / windows/cupboards (Steel Wooden/Aluminium) of any description and size by cleaning, adjusting in position and making the same functional incl fittings (if reqd) with and incl greasing, oiling, screws/nales for fixing the fittings complete all as specified and directed. | 200 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.63 MB
TenderdocuGE34_I.pdf
Tender Documents • 0.27 MB
BOQ_866284.xls
BOQ • 8.84 MB
TenderdocuGE34_II.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .