Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.6 LAccepted-Finance 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | 1 | Accepted-Finance l1 | |
| 2 | 2₹12.1 L+₹1.5 L (13.6%)Accepted-Finance 40 SAPTHAGIRI COLONY JAFFERKHANPET CHENNAI 600 083 | CHENNAI | CHENNAI | TAMIL NADU | 600083 | 2 | Accepted-Finance l2 |
Tender Value
Refer Docs
EMD Value
₹11,400
Closing Date
22 Jul 2024, 2:00 pmClosed
SE MI NCTPS II
O o Superintending Engineer M I NCTPS II CHENNAI 120
NCTPS II M I Circle BM Division Unit I Boiler Annual Overhauling of Water Wall Soot Blowers
2024_EB_460848_1
SE MI NCTPS II O M 148 24 25
Open Tender
Miscellaneous Works
Works
40 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,400
Yes
2 Sept 2024
6 Jul 2024
23 Jul 2024
6 Jul 2024
22 Jul 2024
6 Jul 2024
Amount
Charges for Overhauling of water wall soot blowers including dismantling, inspection, rectification of minor defects if any overhauling and pressure setting of SBV head assembly, renewal of lubrication and gland packing, reassembling, checking alignment inside the furnace and commissioning.
Charges for Overhauling of Long retractable soot blowers including dismantling, inspection, rectification of minor defects if any overhauling and pressure setting of SBV head assembly, renewal of lubrication and gland packing, reassembling including consumables and T&Ps.
Charges for Rectification of defective swivel tube assembly of water wall soot blower work involves cutting and removal of severely deteroriated / eroded portion of swivel tube assembly, preparing edges by grinding, setting, aligning, welding by SS welding rod by IBR welder in existing swivel tube assembly, after rectification and machining to obtain smooth surface for trouble free operation. charges inclusive of consumables, T&P's.
Charges for Rectification of defective Lance tube assembly of Long retractable soot blowers work involves cutting and removal of severely deteroriated / eroded portion of lance tube assembly including releasing of end flange, poppet valve, carriage assembly and steam feed pipe. Then preparing edges by grinding, setting, aligning, welding by SS welding rod by IBR welder in existing Lance tube assembly, after rectification and machining to obtain smooth surface for trouble free operation. charges inclusive of consumables, T&P's.
Chennai Radha Engineering Works (P) Ltd. (BID ID -1088202)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .