Loading…
Loading…
Tender Value
₹31.4 L
EMD Value
₹62,800
Closing Date
4 Sept 2026, 6:00 pm
CWE KOLKATA
Headquarter Commander Works Engineers Military Engineer Services No1 National Library Avenue Alipore Kolkata700 027
COMPREHENSIVE MAINTENANCE OF ELECTRICALLY AND PNEUMATICALLY OPERATED LIFT INSTALLATIONS INSIDE AND OUTSIDE VIJAY DURG UNDER GE (FW) KOLKATA
2026_MES_784529_1
C/8504/E-08/26-27
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
GE FORT WILLIAM KOLKATA
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
GE FORT WILLIAM KOLKATA
₹62,800
Yes
14 Aug 2026
14 Aug 2026
11 Sept 2026
14 Aug 2026
4 Sept 2026
28 Aug 2026
15 Aug 2026 - 22 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Comprehesive maintenance of lifts for day to day routine/periodical maintenance including supply of all consumable lubricants and repair or replacement of all components (spare parts) which may occur due to wear and tear except major parts as specified in notes here in after and paid separetly under relevant items and all as specified in para 16 of section 5 of part 8 of NBC 2016 for electrically operated automatic passenger /goods/ stretcher lift(OEM of lift :-KONE, 06 Passenger,408 Kg, Speed 1 m/s, G+4) for daily /routine/periodical maintenance as per direction of OEM or their accredited, authorised agencies including daily maintenance necessary of records & documents all as specified here in after.
Qty details:- 04 no lift x 11 month = 44 months
Location : New OTM Comd Bldg (P-192) | 44 | Per Lift per calender month | - | - |
| 3 | All as per item No 2 here-in-before but OEM of lift :-KONE, 15 Passenger, 1020 Kg, Speed 1 m/s, (G+5)
Qty details:- 01 no lift x 11 month = 11 months
Location : New OTM Comd Bldg (P-192) | 11 | Per Lift per calender month | - | - |
| 4 | All as per item No 2 here-in-before but OEM of lift :-KONE, 08 Passenger, 554 Kg, Speed 1.5m/s, (G+10)
Qty details:- 02 no lift x 11 month = 22 months
Location : MAP 'A' Block - 01 No & MAP 'B' Block - 01 No | 22 | Per Lift per calender month | - | - |
| 5 | All as per item No 2 here-in-before but OEM of lift :-KONE, 13 Passenger, 884 Kg, Speed 1.5m/s, (G+10)
Qty details:- 02 no lift x 11 month = 22 months
Location : MAP 'A' Block -01 No & MAP 'B' Block - 01 No | 22 | Per Lift per calender month | - | - |
| 6 | All as per item No 2 here-in-before but OEM of lift :- KONE, 13 Passenger, 884 Kg, Speed 1.5m/s, (G+6)
Qty details:- 01 No lift x 11 Months = 11 Months
Location : MAP 'C' Block - 01 No | 11 | Per Lift per calender month | - | - |
| 7 | All as per item No 2 here-in-before but OEM of lift :- Thyssen Krupp, 8 Passenger,544 Kg, Speed 1.5m/s, (G+2)
Qty details:- 01 No lift x 09 Months = 09 Months
Location : MES IB
Note:- This lift will be replaced under sanctioned work. Accordingly, the work will be executed before start of execution of this lift under sanctioned work and in this regard nothing shall be extra paid on this account by the Department. Contractor shall quote his rate accordingly. | 9 | Per Lift per calender month | - | - |
| 8 | All as per item No 2 here-in-before but OEM of lift :- Thyssen Krupp, 8 Passenger,544 Kg, Speed 1.5m/s, (G+10)
Qty details:- 02 No lift x 11 Months = 22 Months
Location : Bldg No P-186 - 01 No & P-187 - 01 No | 22 | Per Lift per calender month | - | - |
| 9 | All as per item No 2 here-in-before but OEM of lift :- Thyssen Krupp, 13 Passenger,884 Kg, Speed 1.5m/s, (G+10)
Qty details:- 02 No lift x 11 Months = 11 Months
Location : Bldg No P-186 - 01 No & P-187 - 01 No | 22 | Per Lift per calender month | - | - |
| 10 | All as per item No 2 here-in-before but OEM of lift :- Johnson, 13 Passenger,884 Kg, Speed 1.5m/s, (G+9)
Qty details:- 02 No lift x 11 Months = 11 Months
Location : JSA Block -I -01 No & Block -II -01 No | 22 | Per Lift per calender month | - | - |
| 11 | All as per item No 2 here-in-before but OEM of lift :- IBIJI, 08 Passenger, 544 Kg, Speed 1.5m/s, (G+5)
Qty details:- 02 No lift x 11 Months = 22 Months
Location : P-1 Bldg - 02 Nos
Note:- Both lifts will be replaced under sanctioned work. Accordingly, the work will be executed before start of execution of those lifts under sanctioned work and in this regard nothing shall be extra paid on this account by the Department. Contractor shall quote his rate accordingly. | 11 | Per Lift per calender month | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
CREDIT.pdf
Additional Documents • 0.63 MB
BOQ_879078.xls
BOQ • 0.33 MB
Tender_Document_E8_26.pdf
Tender Documents • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].