Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.9 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹18.4 L+₹2.5 L (15.7%)Accepted-Finance | 2 | Accepted-Finance 2 | |
| 3 | 3₹18.9 L+₹3.0 L (19.0%)Accepted-Finance | 3 | Accepted-Finance 3 | |
| 4 | 4₹19.0 L+₹3.1 L (19.5%)Accepted-Finance | 4 | Accepted-Finance 4 |
Tender Value
₹25 L
EMD Value
₹75,000
Closing Date
27 Apr 2026, 4:00 pmClosed
Executive Engineer Jal Shakti PHE Div. Bijbehara
Executive Engineer Jal Shakti PHE Div. Bijbehara
Improvements to S.R. filtration plant at Ganeshbal protection of headworks during annual Shri Amarnath Ji
2026_PHE_308275_7
09/PHE/BIJ OF 2026-27
Open Tender
Civil Works - Water Works
Percentage
ganeshbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Jal Shakti PHE Div. Bijbehara
₹75,000
Yes
30 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
21 Apr 2026 - 27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 2 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,
buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement.
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | - | Kg | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: | - | - | - | - |
| 5 | Walls(any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | - | Sqm | - | - |
| 6 | 12mm Cement plaster finished with a floating coat of neat cement of mix: 1 : 4 ( 1 cement : 4 fine sand) | - | Sqm | - | - |
| 7 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | - | Cum | - | - |
| 8 | Engagement of Labours for slit clerance fromSR/SSFP | - | Lab | - | - |
| 9 | Engagement of Labours for taking out the filter media from filter bed | - | Lab | - | - |
| 10 | Engagement of Labours for washing,screening ,gradingn of filter media. | - | Lab | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_999207.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_999207.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .