Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.5 LAccepted-Finance | 1 | Accepted-Finance Technical and financial bid are in order. | |
| 2 | 2₹35.0 L+₹6.5 L (22.9%)Accepted-Finance | 2 | Accepted-Finance Technical and financial bid are in order. |
Tender Value
₹37.6 L
EMD Value
₹75,104
Closing Date
1 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, NACD, APWD, Mayabunder
EE, NACD, APWD, Mayabunder
Retro Fitting and strengthening of Bridge and culvert No.5/B/1 and 3/C/3 at main road from Tugapur Junction to Chainpur under Sub Division No.II, NACD, APWD, Mayabunder.
2023_APWD_9371_1
NIT NO.82/2022-23/EE/NACD
Open Tender
Civil Works - Roads
Works
180 days
EE, NACD, APWD, Mayabunder
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹75,104
3 Mar 2023
15 Feb 2023
2 Mar 2023
15 Feb 2023
1 Mar 2023
15 Feb 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Extra for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out water and removing slush etc. complete. Note for item No. 4.15 :- The quantity will be calculated by multiplying the depth measured from the sub-soil water level up to centre of gravity of concrete under sub-soil water level with quantity of concrete in cum executed under sub-soil water. The depth of centre of gravity shall be reckoned correct to 0.1m. 0.05m or more shall be taken as 0.1m and less than 0.05m ignored.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu- ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing & fixing PVC pipe as weep hole or as directed by Engineer-in-charge (a) 75 mm dia
Surfacing preparation to micro concret by chipping to depth of maximum 75mm cleaning removing the traces of dust, loose concrete including the cost of labour charges, minor tools etc. complete.
Supply and application of epoxy concrete bonding agent (confirming to and having BIS 6319 certification) and over clean and properly prepared old concrete surface to give good bonding between old and new concrete, including cost of all materials minoe tools etc.
Supplying and fixing foam work and shuttering to receive the micro concrete including cost of all materials, all labour charges, minor tools etc. complete.
Supplying and applying high strength non shrink cementinous free flow concrete (with minimum 28 days flexural strength 50kg/sq.cm and compressive strength 500 kg/sq.cm as per BIS 4551-80) for above water level on site to enable completion of pouring in a continous operation. An approved grout concrete mixture of slow speed heavy duty drill and exact quantity of water as recommended should be poured into the vessel slowly and mix the same throughly in a forced action. The mix materials should be placed immediately to position foam work continously to an average thickness of 50mm without any gap including all materials and labour charges etc. complete.
Construction of coffer dam 2m height in the Nallah side of the structure to prevent water from entering the site with suitable materials like jungle ballies, drum sheet etc. on both side and filling non-purvious soil in between with proper compaction. The coffer dam should have strength to witstand the water pressure during flood including bailing out water continously during contruction of structure including dismantling the coffer dam after completion of work.
MONORANJAN MONDAL
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .