Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L-1 | Accepted-Finance ACCEPTED |
| 2 | L-2₹1.4 CrRejected-Finance | ₹1.4 Cr | L-2 | Rejected-Finance REJECTED |
| 3 | L-3₹1.4 CrRejected-Finance MORENA | MADHYA PRADESH | 476001 | ₹1.4 Cr | L-3 | Rejected-Finance REJECTED |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
4 May 2026, 5:30 pmClosed
EEPHE MORENA
EEPHE MORENA
Balance work of Retrofitting Piped Water Supply Scheme under jal jeewan mission at Village RATAN BASAI, CHAND KA PURA Block PORSA
2026_PHED_500072_1
NIT18EEPHE26-27MORENA13.4.2026
Open Tender
Civil Works - Water Works
Percentage
120 days
Morena
AS PER NIT
2 documents required · 2 mandatory
₹12,500
₹1.7 L
10 Jul 2026
13 Apr 2026
6 May 2026
13 Apr 2026
4 May 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of work :- Balance work of Retrofitting Piped Water Supply Scheme under jal jeewan mission at Village - RATAN BASAI Block PORSA Distt. MORENA based on Tube wells including installation of electric submersible / centrifugal water motor pump, laying & jointing of rising main and distribution pipe line system, household tap connections, Site Development around OHT and electric power connections at Tube wells and sump well including cost of all material & labour with 90 Days Trial Run/Commissioning period and 9 Months Operation and Maintenance of entire scheme.
Name of work :- Balance work of Retrofitting Piped Water Supply Scheme under Jal Jeevan Mission at Village:- CHAND KA PURA Block:- AMBAH, Distt. MORENA (M.P.) based on Tube wells including installation of electric Submersible/centrifugal water motor pump, Pump House, construction of 20 KL R.C.C Sump well cum Pump House, construction of 100 KL R.C.C. OHT 12 Mtr. staging, laying & jointing of rising main and distribution pipe line system,household tap connections, Site Development around OHT and electric power connections at Tube wells and sump well including with cost of all material & labour with 90 Days Trial Run/Commissioning period | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.54 MB
18NIT500072.pdf
Tender Documents • 10.53 MB
BOQ_602219.xls
BOQ • 0.27 MB
mandedory.pdf
Additional Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].